Labor contract associated with the 115kV 1894 Line Rebuild project. The scope of this project is to replace the existing wood poles(15) & associated hardware on the 115kV 1894 Line between Holyoke & North Canal Substations. This contract will be for a Transmission Line Contractor to erect the new structures, install hardware & transfer the existing 795 ACSR conductor, fiber optic cable, & distribution underbuilt to the new structures. This will include demolition & disposal of existing equipment