Tenders Are Invited For Expansion Of Photovoltaic Installation Together With The Installation Of An Energy Storage And Heat Pump Installation For The Needs Of The Lung Disease Hospital In Pilchowice.
Tenders Are Invited For Expansion Of Photovoltaic Installation Together With The Installation Of An Energy Storage And Heat Pump Installation For The Needs Of The Lung Disease Hospital In Pilchowice.
1. Order Name: Expansion Of The Solar Installation Together With The Installation Of An Energy Storage And Heat Pump Installation For The Needs Of The Lung Disease Hospital In Pilchowice. Saint. Józef In Pilchowice. Modernization Includes Installation Of Air-Water Heat Pump For The Needs Of Supporting Hot Water Preparation. And The Expansion Of The Existing Solar Installation Along With The Installation Of The Energy Storage. The System Will Additionally Be Equipped With A Energy Management And Production Monitoring System As Well As Electricity And Heat Consumption. The Removal Includes: 1) The Preparation Of Construction Projects To The Extent Necessary To Obtain A Final Administrative Decision (Notification Or Building Permit) - If Required, With Obtaining Arising From The Provisions Of Arrangements, Opinions, Permits - With The Requirements Of The Requirements Of The Act Of 7 July 1994 - Construction Law (Journal Of Laws Of 2013, Item 1409, As Amended) And The Regulation Of The Minister Of Development And Technology Of 20 December 2021 On The Detailed Scope And Form Of Project Documentation, Technical Specifications For The Implementation And Receipt Of Construction Works As Well As A Functional And Utility Program (Journal Of Laws 2021 Item 2454). And Other Arrangements Necessary To Obtain A Landing Permit. 2) Preparation Of Technical/Executive Projects As Well As Technical Specifications For The Performance And Acceptance Of Works According To The Requirements Contained In The Regulation Of The Minister Of Development And Technology Of 20 December 2021 On The Detailed Scope And Form Of Project Documentation, Technical Specification And Receipt Of Construction Works As Well As A Functional And Utility Program (Journal Of Laws 2021 Item 2454). The Technical/Executive Design Should Contain The Entire Detailed Scope Of The Order, Divided Into Individual Tasks. Technical Solutions Should Be Developed Unequivocally And In Detail In Such A Way As Not To Block The Work And Enable Proper Supervision Over Their Performance. 3) All Proposed Solutions Should Be Presented In The Preliminary Phase Of The Ordering Party For Approval. 4) Design Documentation Should Be Developed In A Paper Version - 5 Copies And In An Electronic Version On A Cd Medium, In Particular Containing: - Execution Of The Concept Of Modernized And Designed Installations, Which Should Be Submitted For Approval To The Contracting Authority, - A Detailed Technical Description Of The Adopted Solutions Together With Justification And Necessary Technical Calculations And A Description Of The Adopted Work Technology, - Formal And Legal Attachments, - Construction Drawings, - Construction Drawings (Throws, Cross -Sections, Details) On An Appropriate Scale, - Documentation Should Be Developed In Accordance With The Current Provisions Of The Construction Law And The Applicable Technical Conditions To Be Met By Buildings And Installations, - All Required By The Construction Law Of Consent And
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.