Building Construction Work - Refurbishment Of The Wittenberge Station Reception Building - Los 59 - Painters Inside. The Work Described In This List Of Services Includes The Painting Work On The Earth And The Upper Floors Of The Building. The Quantities Are Carried Out In Principle In Spatially Non -Contiguous Individual Areas, Distributed Across The Entire Building. In The Relevant Floors, The Walls Were Mostly Provided With A New Felt Plaster, In Some Areas Of The Walls There Are Also Existing Plastering Areas, Some Of Which Are Provided With Old Paint. The Entire Wall Surfaces Are To Be Coated With A Silicate Color. The Painting System Consists Of A Basic Paint, An Intermediate And A Final Coating. Gypsum Boxes Suspended In All Rooms Have Been Drawn In By The Drywall Union. These Are Sanded And Are Taped With A Tissue In The Course Of The Painting Work And Receive Two Opaque Paints. It Should Be Taken Into Account That The Ceilings On The Upper Floors Were Carried Out As Heating Blankets. All Colors On The Walls And Ceilings Are Dull Matt. The Colors Must Be Offered At The Choice Of The Client And Coordinated With The Architect By Creating Sample Paintings. Separate Journeys Must Be Included In The Sampling. Protecting The Floor As Well As Built -In Parts Such As Windows, Tiles, Etc. Must Be Incalculated In The Positions As Part Of Your Own Painting Work, Including The Dismantling And Disposal Of The Materials. The Work Includes Approx.: - Zollstoff Fleece With A Dispersion Coat On Ceiling Areas: Approx. 2900 M2 - Filling Work On Walls: Approx. 300 M2 - Silica Painting On Walls: Approx. 8700 M2 - Eserage: Approx. 1,300 M Separate Approaches According To The Construction Process The Work Must Be Included In The Calculation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.