Tenders Are Invited For Engineering Services-Expansion Of The Lucas Cranach Elementary School, Kronach ● Specialist Planning Structural Engineering Planning
Tenders Are Invited For Engineering Services-Expansion Of The Lucas Cranach Elementary School, Kronach ● Specialist Planning Structural Engineering Planning
Engineering Services-Expansion Of The Lucas Cranach Elementary School, Kronach ● Specialist Planning Structural Engineering Planning. The Procedural Object Is The Specialist Planning Structural Engineering (Hoai 2021 Part 4, Section 1, § 51) ● Including The Basic Services Performance Phases 1 - 6 | For The Time Being, Only Level 1 / Lph 1 + 2 Including The Associated Special Services | Further Levels According To The Contract Pattern ● Special Services: Local Construction Monitoring / Engineering Control - Reinforcement | Local Construction Monitoring / Engineering Control - Wood Connections - If Necessary | Setting Up A Cargo Plan, E.G. As The Basis For Building Basic Assessment And Start -Up Counseling | Evidence Of Constructive Fire Protection, If Necessary, Taking Into Account The Temperature (Hot Consideration) ● Only Conversion Measures Are To Be Carried Out In The Interior. A Statically Relevant Intervention In The Existing Building Fabric / The Structure Is Not Planned. Required Partial Services To Advise The Measures Described Should Be Provided According To The Effort And Rewarded Over Hourly Rates. ● The Commission Is Intended In Accordance With The Provision Of Funding And Funds. ● There Is No Legal Claim To The Commissioning, As Well As The Commissioning With Other Levels Or Special Services; ● No Planning Services After Hoai Specialist Planning Have Yet Been Provided. ● It Is Assumed That The Target Finding Phase According To Bgb Has Been Completed With The Available Documents In The Vgv. ● The Essential Information Can Be Found In The Tender Documents (Appendix 01+02+03). Further Documents Will Only Be Made Available To The Selected Bidders With Invitation In Level 2. ● Note: With The Entry Into Force Of The New Version Of The Hoai 2021 On 01.01.2021, The Binding To Minimum And Maximum Rates Is Canceled. The Hoai 2021 Fee Boards Show Orientation Values. The Fee Depends On The Agreement That The Contracting Parties Hit In Text Form. The Client Indicates That According To § 7 Hoai, A Higher Or Lower Fee Than The Orientation Values Specified In The Fee Boards Of The Hoai Can Be Agreed. If No Agreement Has Been Reached, The Basic Services Of The Respective Basic Fee Is Considered Agreed.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.