Tenders Are Invited For Maintenance Of The Rainwater Sewage System In The City Of Gorzów Wielkopolski

Tender Detail

95996452
BZP.271.19.2025
Self-Funded
Tenders Are Invited For Maintenance Of The Rainwater Sewage System In The City Of Gorzów Wielkopolski
NCB
central europe
European Union
09-05-2025

Work Detail

The Order Includes Services Related To The Maintenance And Functioning Of The Rainwater Sewage System In The City Of Gorzów Wlkp. The Work Of The Work Includes, Among Others: 1) Cleaning Of Audit And Absorbent Wells And Street Sewage Wells. 2) Cleaning Channels And Sewage Sewage Networks. Hatching And Sewage Grates As Well As Linear Drainage Elements-Aco-Drain.5) Vertical Regulation Of The Hatching And Sewage Grates. 6) Realizations Reported By The Contracting Authority Urgent Matters Consisting Of, Among Others At: A) Complement The Missing Grilles On The Inlets And Hatches On The Wells; B) Pumping In Water From Roads, Buildings, Green Areas And Other Areas That Have Been Flooded As A Result Of Incorrect Operation Or Failure Of The Municipal Rainwater Sewage System; C) The Opening Of The Inlets, Wells And Channels By Cleaning Them, The Contamination Of Which Causes Flooding In A Given Area, I.E. Roads, Buildings, Green Areas And Other Places Of The Place Work Along With Possible Traffic Difficulties In Accordance With The Regulation Of The Minister Of Infrastructure, Interior And Administration Of July 31, 2002 On Road Signs And Signals; E) Taking Action At The Time Given In The Offer From The Moment The Contracting Authority Is Reported, Also On Holidays From Holiday And Night. Produced During The Implementation Of The Commissioned Works. 10) Of The Management Of Waste Produced During Cleaning The Elements Of The Rainwater Sewage Network In Accordance With The Act Of 14 December 2012 On Waste (I.E., Journal Of Laws Of 2023, Item 1587, As Amended), Because The Waste Arose As A Result Of Cleaning Is The Property Of The Contractor And On His Side He Rests Responsibility For Its Proper Management. Storing In The Magazine Of The Contractor Of Rainwater Sewage System From Dismantling, E.G. Grilles, Hatches. 12) Once A Year Based On A Written Protocol Between The Contractor And The Contracting Authority Should Be Released To The Scrap Metal Point Damaged Elements Of The Rainwater Drainage System Not Being Refused To Re -Use And Obtain Proof Of Accepting The Scay Entitling To Issuing A Sales Invoice By The Department Of The Road; 13) Contractor Responsibility For The Duration Of The Contract For Communication Damages Resulting From E.G. An Unsecured Groove Or The Resulting Range On A Staggering Rain Or Other, And Related To The Implementation Of The Order. 14) The Scope Of Work To Perform And Technology Specifies In Particular: A) Description Of The Subject Of The Contract, B) The Table Of Billing Elements Constituting An Attachment To The Contractors Offer, C) Draft Contract.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail