Works For Complete Or Part Construction And Civil Engineering Work - Expansion And Reconstruction Of The Sewage Treatment Plant At Hofmana Street In Szklarska Poręba In Terms Of Increasing Bandwidth And Removal Of Biogenic Compounds Along With The Construction Of A Sediment Hygiene And Granulation Stations And A Node Of Sand Drainage. 1 - Construction Of The Chamber Of Sewage Chapter And Desefatation Chamber: Construction Of The Chambers Of Sewage Chapter Covered, Equipped With 2 Edge Tilting Transfers, Covering With Steel Sheet; Construction Of Hermetic Deable Devices, Equipping Each Chamber With A Submersible Mixer And With A Redox Probe, A Hermetic Laminate Cover; Liquidation Of Existing Reactors. -Building Of Hermetic Biological Reactors: Equipment With Submersible Mixers On A Tubular Guide, Submersible Pumping Stirrors, Double-Tone Aeration System, Tubular Drain, Redox Probe, O2 Probes, N-Nh4 Probe, Ph And Temperature Probe; Construction Of A Laminate Hermetic Cover. -Top-1 Secondary Settler: Multile-Plated Denny Denny Radial Scraper, Drainage Trough With Adjustable Pilate Transfers And Deflector. -Construction Of Hermetic Aeroic Chambers Of The Sediment Stabilization: Equipment With A Submersible Stirrer, Aigns Of Small Compubious Aeration, Floating Decanter, Emergency Transfer, Density Probe, 2 Biofilters Of Air -Used Air Gate With Electric Drive, Hatch, Hatching Ladders And Ventilation, Hematic Covering, Hematic Coverage With Laminate. -Recovery Of Secondary Settlers For The Function Of Hermetic Retention Reservoirs: Construction Of A Laminate Hermetic Cover, Equipment With An Ultrasonic Level Probe, 2 Biofilters Of Used Air, Reconstruction Of The Pumping Station -Replacement Of Recirculation Pumps For 2 Pumps Performed By Dry, Sewage And Sludge. -Blowers: Dismantling Of Blowers, Equipment With New Blowers; Reconstruction Of The Tubular Installation. -Tpf Dehydration: Replacement Of The Press For A Decanter Centrifugal With A Reconstruction Of The Sediment Evacuation System, Equipment: Automatic Polyelectrolyte Preparation And Dosing Station, Polymer Dosing Pump, Polymer Emulsion Pump, Tablet System Diluting Polymer, Inductive Polymer Flow Meter, Eccentric Pump. Depressed Snail With A Tubular Sediment Evacuation Installation, Manual Hoist, Passable, Wardrobe Wardrobe, Polyelectrolyte Reservoir. -Pix And Pax Stations: Construction Of 2 Integrated Reinforced Concrete Underground Tanks; Equipment Of Bathtubs With Laminate Tanks; Ultrasonic Level Probes, Coagulant Dosing Pumps; Construction Of Trapezoidal Sheet Roof. -Building Tank Stabilization And Thickening Of The Sludge To The Function Of Excessive Sediment Reservoir, Dismantling Of Aeration System. -Building Of The Technical And Warehouse Facilities Building, Equipment With 400V, 230V Installations And Lighting. -Construction Of The Remaining Resistance Wall Along The Oto-1 Secondary Settler. -Hygienization And Granulation Of The Sediment In The Existing Sediment Drainage Building: Construction Of A Burned Lime Silo, Granulator Assembly, Covered Granules Belt Conveyor, Construction Of A Covered Reinforced Concrete, Three -Wound Reloading Box, Transferring From The Drainage Hall To The Present P.