Tenders Are Invited For Metering Instruments - Delivery And Installation Of A Medium Speed Recording Device In The Tunnel Pod Zielonki Along National Road No. S52
Tenders Are Invited For Metering Instruments - Delivery And Installation Of A Medium Speed Recording Device In The Tunnel Pod Zielonki Along National Road No. S52
Metering Instruments - Delivery And Installation Of A Medium Speed Recording Device In The Tunnel Pod Zielonki Along National Road No. S52. The Subject Of The Order Is: Delivery And Installation Of A Device Recording A Average Speed In The Tunnel Near Zielonki Along National Road No. S52. 1. The Order Includes: 1) Delivery And Installation Of The Device Together With The Guarantee, 2) Granting A License For Software 3) Performing The Necessary Installation Work, Including The Necessary Arrangements With The Road Manager In The Scope Of How To Use The Existing Infrastructure When Installing The Device, Performing Necessary Design Studies And The Reconciliation And Connection Of The Device To The Operating Energy Connection (Including An Installation Of The Sub -Clinic), 4) Integration Of The Device With The Canard System, 5) Training Services. A Detailed Description Of The Subject Of The Contract Was Specified In Swz. Iii Description Of The Subject Of The Contract In Iv Part Swz (Ppu) And Attachments To Swz. 2. The Devices Must Be Covered By The Warranty, However, The Warranty Period May Not Be Less Than 36 Months - The Scope Was Specified In Point 4.7.5 Part Iii Swz (Note! Is A Criterion For Evaluation Of Offers). 3. The Order Will Be Processed Within A Maximum Of 18 Weeks From The Date Of The Contract Or Shorter Offered By The Contractor In The Offer (Note! Is A Criterion For Assessing Offers). 4. The Ordering Party Does Not Allow Partial Offers. 5. The Purchaser Does Not Allow The Possibility Of Submitting Variant Offers 6. The Employer Does Not Provide For The Possibility Of Applying The Right Of Options. 7. The Ordering Party Does Not Demand That The Injections Of Evidence In Question Is Submitted. 8. The Purchaser Does Not Provide For The Possibility Of Supplementing The Subjective Measures On The Basis Of Art. 107 Para. 2 Of The Pzp Act. 9. The Employer Does Not Provide For A Pre -Founding Meeting With Contractors. 10. The Employer Does Not Provide For The Obligation To Participate In The Contractor Applying For The Award Of The Contract In A Local Vision While The Contracting Authority Allows The Contractor To Be Visited With The Participation Of The Employers Representative In Accordance With The Provisions Of Swz. Iii Point 4.6. 11. The Ordering Party Allows Subcontractors To Participate In The Performance Of The Order. 11.1. In The Case Of The Participation Of Subcontractors In The Implementation Of The Contract, The Contracting Authority, In Accordance With Art. 462 Para. 2 Of The Public Procurement Law, Requires The Contractor To Indicate Part Of The Contract, Whose Performance Intends To Entrust To Subcontractors, And The Contractor Providing The Names Of Subcontractors Companies (If Known). 11.2. Entrusting The Performance Of Part Of The Order To Subcontractors Does Not Release The Contractor From Liability For Proper Performance Of The Contract. 12. The Contracting Authority Does Not Reserve In The Description Of The Subject Of The Order Of Availability For Disabled People And Design For All Users. 13. The Employer Does Not Reserve The Obligation To Perform In Person By The Contractor With Key Tasks Regarding The Implementation Of The Subject Of The Contract. 14. The Ordering Party Does Not Reserve The Obligation To Perform In Person By Individual Contractors Jointly Applying For The Award Of The Clubs Order
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.