The Subject Of The Contract Is Thermomodernization Of Primary School No. 2 Polish Olympians In Sulęcin, Including Insulation Of External Walls, Insulation Of Roof Slopes With Replacement Of The Covering, Replacement Of Part Of The Window And Door Joinery In The Part Of The Building, Replacement Of Lighting Installations, Christmas Installations, Painting Old Internal Plasters And Other Elements In Accordance With Design Documentation. The Investment Is Included In The Architectural And Construction, Electrical And Sanitary Industries. Constituting - Annex 9 To Swz, I.E. Construction Design, Technical/Executive Design, Energy Audit, Technical Specification Of The Execution And Acceptance Of Works And The Number Of Works. The Number Of Works Attached To Swz Are Only An Auxiliary And Informative Nature. In View Of The Above, There May Be Discrepancies Between The Quantity And Scope Of Works Shown In The Attached Daily Works And The Number And Scope Of Work To Perform Resulting From The Technical Design And From The Technical Specifications Of The Performance And Acceptance Of Works. The Quantity And Scope Of Work Indicated In The Pre -City Of Works Is Not Binding On The Contractor. The Documents Mentioned Above And Other Tender Documents Will Be Used, Read And Interpreted According To The Following Priority: 1. Contract, 2. Offer Form, 3. This Swz, 4. Design Documentation: 4.1. Construction Design, 4.2. Technical/Executive Design, 4.3. Energy Audit, 4.4. Technical Specification Of The Execution And Acceptance Of Works, 4.5. Nations Of Works As Auxiliary Documents. Note! The Works Will Be Carried Out In The Active School Facility. Therefore, Construction Works Inside The Building Should Be Carried Out During Periods Of Breaks In The Functioning Of The Facility, I.E. During Summer Holidays, Winter Holidays And Other Breaks Provided For In The Schedule Of The School Year. It Is Possible To Regularly Conduct Internal Works And Replace The Window And Door Joinery During The School Year After Agreeing These Works (Written Consent) With The Contracting Authority And The School Management (I.E. Providing Available Subsequent Rooms Of The Contractor). The Organization Of Work Must Take Into Account The Need To Ensure The Maximum Level Of Safety Level Of Students And School Staff. In Connection With The Above, The Daily Presence Of A Construction Manager At The Investment Area During The Implementation Of Works Is Required.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.