3 Łomżyńska 25/1, Through: - Implementation Of Project Documentation, Including Land Use Project And Necessary Executive Projects Together With The Bill Of Quantities And Cost Estimates Based On A Functional And Utility Program), Energy Audit Of The Building (Annex No. 14 To Swz), Bill Of Quantities (Annex No. 15 To Swz - As An Auxiliary Document) And The Notes Of The Contracting Authority. - Obtaining The Necessary Arrangements, Permits (If Required). - Execution Of Construction And Installation Works, Works Related To Land Development And The Necessary Acceptance Allowing To Proceed With The Use Of The Building. 2. The Subject Of The Contract Includes The Development Of Executive Documentation For The Task In All Necessary Industries To The Extent Necessary To Perform Construction Works Based On Them. The Design Documentation Must Be Developed In Agreement And Agreement With The Employer, As Well As The Necessary Arrangements In Terms Of Hygienic And Sanitary And Fire-Fighting. 3. As Part Of The Investment, It Is Planned To Carry Out Activities Involving The Improvement Of The Energy Efficiency Of The Building Of The Municipal Cultural Center In Miastków Aimed At Improving The Thermal Insulation Of Building Partitions, Which Will Reduce Heat Loss And Reduce Energy Demand. In Addition, It Is Expected To Install Renewable Energy Installations (Including Solar Systems And Ground Heat Pumps), Which Will Support The Sustainable Power Supply Of The Building And A Comprehensive Replacement Of Electrical And Lighting Installations. The Building Should Be Covered By The Energy Management System. 4. The Subject Of The Contract Includes The Implementation Of Construction Works Related To The Thermomodernization Of The Object, Including:- Insulation Of Foundation Walls (Partial)- Insulation Of External Walls- Insulation Of The Sloping Roof- Insulation Of The Ceiling Above The Attic- Replacement Of The Window- Replacement Of External Doors- Replacement Of Radiators- Partial Replacement Of Sanitary Installation With Insulation. Pipelines- Replacement Of Luxury- Assembly Of Electrical Heaters- Assembly Of A Ground Heat Pump- Installation Of Solar Installations- Replacement Of Ceiling And Wall Luminaires- Replacement Of The Electrical Installation Of Switches, Plug Sockets- Switching Replacement- Control Of The Meters- Assembly Of The Meter- Assembly Of The Energy Management System. 5. The Functional And Utility Program Does Not Replace The Executive Project, But Constitutes Guidelines Specifying The Standards Of Performance And Quality Of Work. The Functional And Utility Program (Pfu) Is The Basis For The Requirements For The Contractor Carrying Out The Task In The Scope Of Comprehensive Order Implementation. The Information Provided In Pfu Is Not Released By The Contractor From The Obligation To Undergo A Local Vision At The Facility Covered By The Study And Execution Of Executive Documentation Before Starting Work. 6. The Projects, Materials And Devices Int
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.