Engineering Design Services-M60 Pécs-Szigetvár, Bicksér Avoiding Planning. M60 Motorway Between Pécs-Szigetvár Is A Construction Plan With A New Junction, Connecting With The 6Th Main Road (Bicsérd Oriental Bypass) The Following Main Estimated Quantities: M60 Pécs (31+160 Km) Szigetvár West (68+407 Km), ~ 37 Km 2X2 ( - 31+160 And 31+996 Km ~ 1 Km Currently Expanding 2X1 Lane Existing Trail Into A 2X2 Lane Motorway; - 31+996 And 68+050 Km Section ~ 36 Km On A New 2X2 Lane Drive; - 4 Special Nodes, According To The Licensee Plans, And 1 New Special Level Junction At The Location Of The Separate Level In 41+329 Km Compared To The Licensee Plans; - 12 Nodes In Level; - 1 Bilateral Simple Rest; - 1 Bilateral Complex Resting; - 1 Engineering Site With Police Building; - 34 New Artwork On The National Road, Of Which The Major Ones Are: - B.400 J. Main Course Bridge Over The Pécs-Water And Zóki Trench In The 40+000.00 Km Section Of The M60 Motorway, With A Length Of 335.24 M; - B.336 J. Main Course Bridge Above The Keszü Mörtház Area And Wild Gateway In The 33+619.82 Km Section Of The M60 Motorway, 196 M; - B.631 J. Main Course Bridge In No. 6. Main Road And Planned No. Crossing The Main Road (K5 J - 6607 J. 2.6 Km Long 2X1 Lane Connection Using A National Road. Main Road (At Szigetvár); - Related 4.6 Km Long 2X1 Lane 5832 J. The Preparation Of The Entire Construction Plans And Bim Model Of The Connecting Road (At Szentlőrinc) Is Based On The Construction Permits And Licensing Plans. Due To The Technical Content Changes, It Is Necessary To Modify Existing Environmental And Building Permits Or To Obtain New Permits, Including Amending The Licensing Plans And The Environmental Impact Study. During The Design, The Possibility Of Implementing The Motorway At 2 Separate Phases Should Be Provided, I. Pécs-Bicérd (With A Bicry Junction) And Ii. Bicsérd-Szigetvár Sections. For Bicsérd Eastern Bypass: - A 2X1 Lane National Road Driver 4.5 Km Long New Track - A Decision Preparation Study, Pre -Examination Documentation, Complete Licensing Plans, Complete Construction Plans And Bim Model. Detailed Information In Public Procurement Documents (Volume Iii, Design Disposition/Task Description).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.