Design Modeling Services-Framework Contract Bim Control Existing 2026-2029. The Following Should Be Implemented: Advising Activities: Advising Activity With Regard To The Bim Method For All Bim Projects For All Phases Of The Construction Project On Appendix Asse Ii. As A Result, A Report Is Generally Delivered In German By The Contractor. The Shape And Scope Of The Report Is Specified Depending On The Order By The Bge. Control/ Testing Of 3D Models: As Part Of The Planning Measures, 3D Models Of The Construction Projects Are Submitted By External Planners. Furthermore, 3D Points Clouds Bim Models Of Structures Are Created Overtime And Underground. These Models Are Checked For Completeness, Freedom Of Collision And Other Necessary Parameters Across All Performance Phases. As A Result, A Report In German Is Generally Delivered On The Part Of The Contractor. The Shape And Scope Of The Report Is Specified Depending On The Order By The Bge. Furthermore, The 3D Model Test Bcf Files Generated And Forwarded To The Contractor. Creating And Adapting Bim Documents: The Bge Has Sample Aia, Sample Bap And A Bim Modeling Manual. Depending On The Project, The Aia And Bap Must Be Adapted To The Project. Furthermore, Different Other Bge Bim Documents Are Created Or Supplemented By The Contractor. All Documents Are To Be Created In German.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.