Tenders Are Invited For Construction Works As Part Of The Task Entitled: Reconstruction Of The Pedestrian Footbridge For A Culvert Along The Park Path In Młynówka Królewska In The Młynówka Królewska Park In Krakow,
Tenders Are Invited For Construction Works As Part Of The Task Entitled: Reconstruction Of The Pedestrian Footbridge For A Culvert Along The Park Path In Młynówka Królewska In The Młynówka Królewska Park In Krakow,
1. The Subject Of The Procedure And Order Is The Selection Of A Contractor For Construction Works Related To The Demolition Of The Existing Footbridge And The Construction Of The Culvert Together With The Reconstruction Of The Gas Network As Part Of The Task Entitled: Reconstruction Of The Pedestrian Footbridge For A Culvert During The Park Path In The Królewska Młynówka In The Młynówka Królewska Park In Krakow, For The Management Board Of City Greenery In Krakow.1.1 In Accordance With Art. 310 Of The Pzp Act, The Contracting Authority Provides For The Possibility Of Annulment Of The Proceedings In Question, If The Public Funds That The Employer Intended To Allocate To Finance All Or Part Of The Contract, Were Not Granted To Him. 1.2 The Subject Of The Procedure And Contract Is The Investment Related To The Implementation Of The Task Entitled: Zzm/O1.57/22 Młynówka Królewska - Longest Park In Poland! New Stage.1.3 The Investment Area Is Located On Plots No. 327 And 172 K-48 Unit Or Krowodrza.1.4 The Scope Of The Intention Includes, Among Others: Measuring, Demolition, Preparatory Work, Including The Demolition Of The Existing Wooden Footbridge Founded On Concrete Supports, Along With Its Utilization. 1.5 Construction In The Place Of The Existing Framework Of The Frame Culvert, Reconstruction Of The Medium -Pressure Gas Network, Construction Of A Technical Channel For Carrying Out The Nn Cable Line Of Park Lighting. The Construction Of The Culvert And The Reconstruction Of The Gas Pipeline Should Be Made In Accordance With The Design Documentation And The Conditions Attached To The Documentation. 1.6 Before Starting Gas Works, The Gas Pipeline Technology Card Should Be Prepared And Approved. Earthly Should Be Carried Out Without The Use Of Heavy Equipment (Manually) .1.10 The Existing Green Should Be Secured, The Contractor Will Ensure Dendrological Supervision. 1.11 The Documentation Includes The Necessary Opinions, Arrangements And Decisions, Including The Building Permit: Au-01-6.6740.9.325.2024.Plo Of 30.01.2025. And Conservation Recommendation No. Kz-03.4120.4.8.2024.Sp+Mmr Of 19.09.2024.1.12 The Works Should Be Carried Out In Accordance With The Design Documentation, Technical Specification Of The Execution And Receipt Of Construction Works (Called Stwiorb In Short) And In Accordance With The Attached Graphic Attachments. 1.13 Integral Part Of Swz Is Necessary For The Performance Of The Subject Of The Contract Are Swz, And In Particular Design Documentation With Arrangements, Stwiorb, Grasslands, Tables Of Eliminated And Manufactured Elements (Maintenance, Property), Material Approval Cards, Templates Of Subcontracting Statements, Protocol Patterns, Guidelines, Equivalence Table And Other Attachment No. 9 To Swz (1 File In Zip Format). The Contracting Authority Points Out That It Has The Right To Update The Designs During The Proceedings And During Construction. 1.14 The Ordering Party Points Out That The Attached Entities Are Only Approxima
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.