The Work Includes The Following Per Traffic Control Installation (Vri) In Main Lines: - Vris 01, 02 And 03: Fully Removing Existing Installation And Delivery And Installation Of A Completely New Installation - Vri 04: Remove Existing Traffic Control Set And Installation And Installation Of A New Traffic Control Device - Vris And 06: Remove Existing Traffic Controls And Existing Traffic Controls And Instructions For Traffic Control Asset And Instructions For Traffic Controls And Consistency Asset And Arrangement Aimed Asset And Arrangement Aimed Asset And Instructions For Traffic Controls And Existing And New Traffic Lanterns The Work Mainly Consists Of: A. Fully Removing And Removing (Parts) From Vris; B. Supplying And Applying 6 New Traffic Control Equipment (5 Ivras, 1 Vra); C. Delivering And Applying Traffic Lanterns (Led Class-2, 42 Volts); D. Delivering And Applying Mast Material; E. Delivering And Applying Detection (Detection Loops And Push Buttons With Return); F. Delivering And Applying Soil Cables; G. Disconnected And Then Reconnect V 6 Vris Replaced And Maintained
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.