Construction Of A Water Treatment Station Along With Water Intake For Economic Activation Areas In Stryków - Stage Ii. The Scope Of Work In Accordance With The Attached Bill Of Quantities And Design Documentation. The Contractor Will Perform All Necessary Works For The Correct Performance Of The Subject Of The Contract, Along With The Start Of Devices And Training Of The Users Employees. The Work Should Be Carried Out In Accordance With The Tender Documentation And In Consultation With The Employer. In Addition, The Scope Of Work Includes: 1) Preparation Of Full Documentation - 2 Copies In Polish, Which Consists Of: A) As -Built Documentation: B) Approvals For Materials And Prefabricated Elements, C) Operating Instructions, Maintenance And Operation Of Devices 2) Works Acceptance Protocols. 3) Required Documents Regarding Research, Measurements And Checks Carried Out By The Contractor, Technology Of Performing Works: Work Related To The Implementation Of The Investment Should Be Carried Out In Accordance With Applicable Standards, Building Law, Laws Regarding Technical Requirements, Environmental Protection, In Accordance With Health And Safety And Technical Knowledge. All The Materials Used Must Have Appropriate Approvals, Approvals And Certificates As Well. In Addition, Each Material Used Should Be Agreed With The Contracting Authority, The Lack Of Agreement Will Result In The Replacement For The Appropriate, The Cost Of Replacement Will Be Fully Incurred By The Contractor. If The Contractor Does Not Comply With The Recommendation, The Ordering Party Will Order The Above Actions To A Third Party And Deduct The Costs He Incurred From The Contractors Remuneration, And When This Amount Proves Insufficient, He Will Reim The Subject Of The Order. The Application Allows The Use Of Materials, Solutions, Technologies And Equivalent Standards With Technical, Construction And Utility Parameters No Worse Than Those Assumed In The Technical Specification And Receipt Of Construction Works And Design Documentation. The Removal Requires The Submission Of Relevant Documents, Authenticating These Materials. The Contractor, At His Own Responsibility And At Its Own Expense, Should Take All Preventive Measures Required By Reliable Construction Practice And Current Circumstances To Secure The Rights Of Owners Of The Property Adjacent To The Construction Site/Works And Avoid Causing Any Disturbances Or Damage There. The Contractor Is Responsible For Any Damage Resulting From The Implementation Of The Subject Of The Contract In Relation To Third Parties. The Method Was Permanently Protected Against The Impact Of Works. Social Clause: The Ordering Party Requires That Persons Performing Services And Works Specified In The Project Documentation And Equipment Operators Should Be Employed On The Basis Of An Employment Contract By The Contractor Or Subcontractor, Except For Persons Whose Obligations Do Not Consist In Performing Work In The Manner Specified In Art. 22 § 1 O
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.