4.1. The Subject Of The Contract Is Construction Works On The Investment Task Entitled Construction Of A Sewage Network In Majdan Wielki, Krasnobród Commune Divided Into The Following Tasks: 4.1.1. Task No Pe-Rc Sdr17 Dn200x11.9Mm With A Length Of 41.8M, By Controlled Drilling Method, 4.1.2. Task No. 2 - Construction Of Sewage Connections In The Town Of Majdan Wielki In The Commune Of Krasnobród - (Based On A Construction Design) The Scope Of Works Includes, In Particular: 1) The Execution Of The Connection Of Gravity Sanitary Sewage System Made Of Pvc Pipes Sn8 Little Dn 160 Mm With A Length Of 25.8 M, Open Excavation, 4.1.3. Task No Gravitational Sanitary Sewage Network From Pvc Pipes Dn 200Mm With A Length Of Approx. 998M, An Open Excavation And Drilling Under The Road, 3) Execution Of A Network Of Sanitary Sewage System With Pe-Rc Sdr17 Min. Dn90mm With A Length Of Approx. 370M, By Controlled Drilling Method, 4.1.4. Task No Sewage Pipes From Pvc Pipes Sn8 Lity Min. Dn 160Mm With A Length Of Approx. 218M, An Open Excavation And Drilling Under The Road, 4.1.5 Task No. 5 - Ict System For Management Of Water Supply Management - (Based On Pfu). The Order Of The Contract Is The Design And Performance Of Construction - Assembly Works In The Formula Design And Build The Investment Project Provides: Implementation Of The System. Ict For Management Of Water Supply Management, In Accordance With The Assumptions Of Pfu For 100 Farms Within The Town Of Majdan Wielki. 4.3. Detailed Description Of The Subject Of The Contract: 4.3.1 Task No. 1 And Task No. 2 - Conditions For The Implementation Of The Contract And Its Subject Scope, Including The Scope Of Design Work And Works Are Determined By The Design Documentation - Annex 1.1 To Swz, The Following Documents Consist Of: 1) Design Documentation, 2) Technical Specification Of The Performance And Receipt Of Construction Works (Stwiorb), 3) Premier Of Works, Due To The Fact That The Remuneration Of The Contractor Indicated In The Offer It Will Have A Flat -Rate Nature, The Contractor Should Be Based On The Scope Indicated In The Design Documentation Referred To In Point 4.3.1. 1) And Stwiorb. The Bill Of Quantities Is Auxiliary. Speeching During The Implementation Of The Contract Not Included In The Prejudice Or Works In A Larger Quantity In Relation To The Pre -City Adopted In The Pre -City Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Project Documentation Referred To In Point 4.3.1.1) And Stwiorb. 4.3.2 Task No. 3, Task No. 4 And Task No. 5 - Conditions For The Implementation Of The Contract And Its Subject Scope, Including The Scope Of Design Work And Works Are Set Out In The Functional And Utility Program (Hereinafter Also Called: Pfu) Together With Attachments - Annex 1.2 To Swz, Annex 1.3 To Swz And Template Of The Contract - Annex No. 2 To Swz, And In The Scope Of Works. Project Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.