Tenders Are Invited For Construction-Site Supervision Services-Selection Of A Contractor For The Preparation Of A Complex Conformity Assessment Report With The Basic Requirements For The Construction And Technical Control Of The Part Structural And The Exercise Of Construction Supervision During The Construction Of The Site 28 66. Dragichevo, With Per 32.23251-07 Id No.
Tenders Are Invited For Construction-Site Supervision Services-Selection Of A Contractor For The Preparation Of A Complex Conformity Assessment Report With The Basic Requirements For The Construction And Technical Control Of The Part Structural And The Exercise Of Construction Supervision During The Construction Of The Site 28 66. Dragichevo, With Per 32.23251-07 Id No.
Construction-Site Supervision Services-Selection Of A Contractor For The Preparation Of A Complex Conformity Assessment Report With The Basic Requirements For The Construction And Technical Control Of The Part Structural And The Exercise Of Construction Supervision During The Construction Of The Site 28 66. Dragichevo, With Per 32.23251-07 Id No.. The Purpose Of The Public Procurement Is To Determine The Contractor Of The Consulting Service (Construction Supervision) In Connection With The Design And Construction (Engineering), The Preparation Of A Complex Report On Conformity Assessment With The Basic Requirements For The Construction And Technical Control Of The Contract, And The Exercise Of The Construction Of The Contract During The Construction Of The Object, Such As The Construction Of The Object, And Construction Of The Site In Accordance With The Technical Specifications (Annex B), Regulatory Requirements And Compliance With The Agreed Terms. The Subject Of The Public Procurement Includes A Description Of The Contract Activities As Follows: (A) Stage I - Preparation Of A Comprehensive Compliance Assessment Report With The Basic Requirements For The Construction And Technical Control Under The Part Constructive Of The Project Development: A.1) Preparation And Submission Of The Contracting Authority Of Written Opinions At Each Stage Of The Design Is Required. A.2) Preparation And Provision Of The Contracting Authority With The Acceptance And Delivery Protocol Of A Ready -Made Compliance Report On The Conformity Assessment Of The Investment Project With The Essential Requirements For The Construction, Including The Technical Control Under The Part Constructive, On The Basis Of The Project Documentation Provided By The Contracting Authority Necessary For Its Preparation. Following The Adoption Of The Report And His Approval By The Contracting Authority Without Errors And/Or Incompleteness, And/Or Inconsistencies, The Consultant Draws Up A Certificate For Payment Of The Activities Under Stage I For Its Payment. B) Stage Ii - Exercise Of Construction Supervision During Construction, In Accordance With The Requirements Of The Spatial Planning Act (Territorial Development Act) And The By -Laws. B.1) Coordination Of The Construction Process Until The Commissioning Is Put Into Operation; B. B.3) Control Of Construction Products Used In The Construction Before And During Construction And Assembly Works (Construction Works); B.4) Control Of The Construction Works Performed; B.5) The Consultant Must Use An Accredited Construction Laboratory Other Than The One That Will Use The Contractor To Carry Out Compulsory Samples, Tests And Controls During The Implementation And Acceptance Of Construction Works, According To Tc 2025 Of The Road Infrastructure Agency. To Be Present And To Monitor The Samples Of Samples And Their Testing In Laboratory Conditions When The Sampling Is Carried Out By The Contractor Under The Design And Construction Contract. To Conduct Samples And Testing Of Materials And Quality Of Execution Where This Is Applicable, As Well As To Carry Out Tests When The Standards Reached Are Necessary; B.6) Daily Control Of Construction
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.