GTR 95451425
Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – Ve51_Lüftung-Msr
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
95451425
Tendering Authority
Subscribe to view
Tender No
254434-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Heating, Ventilation And Air-Conditioning Installation Work – Ve51_Lüftung-Msr
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
20-05-2025
Closed
Work Detail
Heating, Ventilation And Air-Conditioning Installation Work – Ve51_Lüftung-Msr. Space Air -Technical Systems, Ventilation Devices With Heat Recovery, Interior Installation. Return Over The Roof, Outside Air Over Facade Or Roof. Supply And Exhaust Air Channels And Lines Under The Floor Ceilings. 1 St. Ventilation Device 16,750M³/H 3 Pctonal Ventilation Device Approx. 1,700 To 2,100 M³/H Each Belonging To The Rlt Device, Sewer Smoke Switch. 1 Pc. Lamelle Hood Approx. 2,000 M³/H 2 Pcs Bubbles 135 ° Approx. 3,750 M³/H And 16,700 M³/H 3 Pcs Insulated Flat Roof Implementation 2 Pc Weather Protection Grille Facade Approx. 4,000 M³/H And 17,000 M³/H Approx. 420 M Wrap Folding Pipe Nw 100 - 315 Mm, Approx. 400 Fringe/Fittings/Volume Power Controller Approx. 40 St. Ripe Silencer Approx. 20 P. Fire Protection Flaps / Spring Return Nw 100 - 250 Mm, Including The Dumplings Approx. 1,000 M² Air Duct L1 - L4 Approx. 750 M² Molded Parts F1 - F5 Approx. 14 Pcalousie Flaps With Drive Approx. 20 P. Mineral Fiber Approx. 10 M² Fire Protection Technology. Calcium Silicate Cladding Approx. 20 M² Fire Protection Technology. Disguise Mineral Wool Approx. 90 Pcs And Exhaust Aircraft Reserves Approx. 30 Pcs And Exhaust Air Ceilings Approx. 40 Pcs And Exhaust Air Lattice Grilles Approx. 20 Pcs With Connection Boxes 1 St. Air Conditioning Split Facility 5 Kw, Inside Ceiling Cassette Tightness Testing On 10 Channel Network Sections Implementation Hygiene-Freezing Inspection Per System. Building Automation, Automation Facility To Control A Heat Pump System And Four Ventilation Devices. The Cascade Heat Pump System And The Ventilation Devices Each Have Their Own Basic Regulations, Which Is Connected To This. 1 St. Installation Center Ddc, Touchscreen 8 St. System Images Approx. 375 Data Points (Ba, Aa, Be, Ae) Approx. 1,700 Data Points (Processing Functions) 2 Pcs Control Cabinet. J-Y (St) Y 2X2x0.8 To 10X2x08 Approx. 45 Temperature And Moisture Measuring Value Approx. 6 Pc Heating Valves With Actuator 4 Pcs Local Control Tableau 8 Pc Differential Pressure Measuring Value Ventilation Approx. 2,200 M Cable Nym 3X1.5 Mm² Approx. 2,500 M Cable J-Y (St) Y 2X2x0.8 To 10X2x0 Approx. Fire Bulkheads Solid Wall Approx. 90 M Cable Channel
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
88c780b7-6f3f-4874-b58d-735bbd89dc2f.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.