GTR 95314486

Tenders Are Invited For Technical Planning Services - New Construction Of The Fire Service Equipment House With A Vehicle Hall And Training Room In Swisttal - Buschhoven Tga

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
95314486
Tendering Authority
Subscribe to view
Tender No
241779-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Technical Planning Services - New Construction Of The Fire Service Equipment House With A Vehicle Hall And Training Room In Swisttal - Buschhoven Tga
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
12-05-2025 Closed
Work Detail
Technical Planning Services - New Construction Of The Fire Service Equipment House With A Vehicle Hall And Training Room In Swisttal - Buschhoven Tga. The Need Planning For The Construction Of The Buschhoven Fire Station Was Developed With The Development Of The Feasibility Study By The Engineering Office Dr. -Ing. Fischer Con-Sult From January/February 2023 Checked. The Planning Presented There And The Cost Approach In The Feasibility Study Forms The Basis For The Present Tender Procedure (See Appendix 08 Feasibility Study New Construction Of The Feu-Erwehrhaus Am Fienacker In Swisttal-Buschhoven). The Construction Of The Fire Station Is Said To Be Fairly Meet Todays Requirements. Furthermore, A Contribution To Environmental And Climate Protection Should Be Made. A Reduction Of The Use Of Gray Energy (Energy For Manufacturing, Losing, Transport, Disposal Of A Product), As Well As By The Installation Of Durable Materials With Low, Until No Maintenance Intervals Can Be Achieved. Savings Of Co2 Emissions And A Minimization Of The Use Of Fossil Combustion Beams Are To Be Achieved By Using Regenerative Building Materials And By Efficient Heat Generation With A High Level Of Efficiency, Since The Municipality Of Swisttal Has Been Subject To Co2 Neutrality By 2045. The Scope Of The Tender, Which Is Presented In The Present Advertisement, Includes Engineering Services Of The Technical Building Equipment In Accordance With §§ 53 Ff. Hoai, Performance Phases 1-9, Possibly Gradual Assignment In A Maximum Of 3 Stu-Fe (Planned Are Levels For Performance Phases 4, 5 And Leis Rectification Phases 6-9). First Of All, The First Order Stage (Performance Phases 1-3) Should Be Commissioned With The Surcharge Alone. In The Later Negotiating Process, The Fee Zone Must Be Found And Freely Offered By The Bidders. The Construction Project Is Expected To Be Realized By The End Of 2026. The Litstore Provision Will Essentially Extend To A Performance Period Of Approximately 17 Months (Completion Of Performance Phase 8), Whereby A Period Of Approx. 2 Months After The Surcharge Will Probably Be Available For An Application (Final Service Phase 3). The Bidders Must Therefore Start Immediately According To The Surcharge (Probably On July 29, 2025) And Plan Corresponding Capacities. Details Are Discussed In The Negotiating Process And Finally Determined.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
51afbaac-67cc-4ebe-8f89-223222addb8a.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders