GTR 95313124
Tenders Are Invited For Plasterboard Works - Drywall Work Bph2
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
95313124
Tendering Authority
Subscribe to view
Tender No
241914-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Plasterboard Works - Drywall Work Bph2
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
13-05-2025
Closed
Work Detail
Plasterboard Works - Drywall Work Bph2. Conversion Area East (Care): Approx. 774 M² Wall Clothing Dry Plaster Approx. 230 M² Free -Standing Intentions, Height Up To 4.10M Approx. 2,180 M² Non -Bearing Partitions As Assembly Walls, H To 4.1M, Iw 100 To 300 Mm, 47Db, Partly With F30 And F 90 Approx. 100 M² Non -Loading Separating Walls, H To 4.1M, Iw 350 To 550 Mm, 47Db, Partly With F30 And F 90 Approx. 745 M² Plasterboard Slope Ceilings, Smooth, Partly With Fire Protection Requirement F 30 Approx. 240 M² Plasterboard Slope Ceilings, Perforated Plates Approx. 430 M² Heating And Ceiling Approx. 270 M² Metal Corridor Blankets, Partly With A Fire Protection Requirement Approx. 14.50 M² Grid Ceiling 2 Scc Double Glazing Conversion Area (Prosecture): Approx. 614 M² Wall Clothing Dry Plaster Approx. 7.4 M² Freestanding Intentions, Height Up To 4.10M Approx. 81.50 M² Non-Bearing Partitions As Assembly Walls, H To 4.1M, Iw 100 To 300 Mm, 47Db, Approx. 4.0 M² Non-Bearing Walls As Installation Walls, H To 4.1M, Iw 500 Mm, 47Db, Approx. 108 M² Plasterboard Slope Ceilings, Partly With Fire Protection Requirement For 30 Approx. 89 M² Metal Corridor Ceilings With Fire Protection Requirement F30 Conversion Area (Kitchen), Moisture -Loaded Interior: Approx. 9 M² Wall Clothing Dry Plaster Approx. 110 M² Free -Standing Intentions, Height Up To 4.1² Non -Loading Partitions As Assembly Walls, H. Up To 4.1M, Iw 150, 47Db, Approx. 21 M² Plasterboard Slope Ceilings, Smooth, Approx. 28 M² Grid Ceiling As A Visible Grid System Building Step 2.2: Approx. 830 M² Wallwear Dry Cleaning Approx. 90 M² Free -Standing Intentions, Height Up To 4.10M Approx. 900 M² Non -Loading Separator As Assembly Walls, H To 4.1M, Iw 100 To 200 Mm, 47Db, Partly With F30 And F 90 Approx. 55 M² Non -Bearing Partitions As Installation Walls, H To 4.1M, Iw 225 To 550 Mm, 47Db, Partly With F30 And F 90 Approx. 415 M² Plasterboard Slope Ceilings, Smooth, Partly With Fire Protection Requirement For 30 Approx. 34 M² Plasterboard Slope Ceilings, Perforated Plates Approx. 167 M². Kühdecks Approx. 141 M² Metal Base Blankets, Sometimes With A Fire Protection Requirement
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ac2a542e-e26d-4083-892e-b2df7fccf5c2.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.