Laboratory Building Construction Work - Laboratory Work Laboratory Work Laboratory Bass Component L. Lmu Ama54, Renewal Building/Laboratory In The Course Of The Measure, Gas Connections Must Be Created For The New Laboratory Rooms And Connected To The On-Site Supply. Compilation Main Masses: 900 M Copper Pipe For Non -Ferrous Box Up To 5.0 From Dn 10 To Dn 50 500 M Stainless Steel Tube Pressed From Dn 32 To Dn 50 170 M Stainless Steel Tube Welded From Dn 40 To Dn 65 100 Pieces Of Ball Taps From Dn 10 To Dn 50 30 Pieces Withdrawal. Vacu Pump Exhaust Gas 15 Pieces Connection Point Prevacuum 100 M Disassembly Copper Pipes From Dn 10 To Dn 32
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.