GTR 95168091
Tenders Are Invited For Construction Of Road Lighting In Goślinowo, Leszek Biały
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
95168091
Tendering Authority
Subscribe to view
Tender No
OSOP.271.18.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of Road Lighting In Goślinowo, Leszek Biały
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
24-04-2025
Closed
Work Detail
Designed Road Lighting: In Order To Connect New Lighting Lamps: From The Stone Cable Connector Skp4-0/3-1P No. 0087586 (Iv/1) Build A Nn 0.4Kv Cable Line Yaky 4X35mm2 With A Total Length Of 1 (4) M To A Free-Standing So2 Lighting Cabinet (According To Fig. E-1) Built-In So2 Lighting Cabinet On Plot 219/72 Sheet 2 Goślinowo Precinct In Accordance With The Attached Fig. No. E-1, Proof. From The Pro From The Pro In The Places Shown On The Situational Set, Set Up A 7M Octagonal Steel Lighting Poles. Install A Single Boom With A Height Of 1.0M And A Length Of 1.0M On The Pole. Lighting Poles Should Be Founded On Prefabricated Foundations B-120. In The Place Shown On The Situational Plan, Set Up A 6M Octagonal Steel Lighting Pole. Install A Single Boom With A Height Of 1.0M And A Length Of 1.0M On The Pole. The Lighting Pole Should Be Founded On The Foundation Of Prefabricated F-100. On The Design Of The Lighting Pole, A Steel Octagonal 6M, Install The Led 20 Leds 930Ma Nw 740 Street Lighting. 60W. On The Design Of The Lighting Pole, The Steel Oight -Arong 7M Install The Led Street Lighting Luminaire 20 Leds 930Ma Nw 740 With 60W. Protection Of Individual Luminaires Using A D01/Gl 2A Fuse. Combination Of Protection With Luminaires Inside The Pole And Booms. Make 3X2.5Mm2 Ydyżo Lines With 9M Long (For 7M Pole) And 3X2.5Mm2 Ydyżo Type With 8M Long (For 6M Pole). All Poles Should Be Grounded To The R≤10 Value. On The Lighting Cabinet, Build A Plate With The Name Of The Device Owner, I.E. Gniezno Commune. Lead Work In Accordance With The Technical Conditions, Follow The Crossing Through The Road With A Squeeze, In The Ø75 Curtain Pipe, Without Violating The Road Surface, Taking Into Account The Rights Of Third Parties, In Accordance With Applicable Technical Regulations. After Completing The Works, The Road Lane Should Be Restored To The Original State At Your Own Expense And Reported For Collection Within 14 Days. Keep Normative Distances Vertically And Horizontally From Underground Devices. Before Starting The Work, You Should Read In Detail The Content Of The Protocol From The Coordination Meeting Meeting And The Content Of Other Arrangements. The Investment Covered By The Local Development Plan Approved By Resolution No. Iii/29/2006 Of The Gniezno City Council Of 29.12.2006 Regarding The Local Spatial Development Plan For Housing Buildings In The Village Of Goślinowo - Plot No. 219/1 (Announced In The Official Journal Of The Wielkopolska Voivodship No. 68 Item 1780 Of 10.05.2007). The Planned Investment Does Not Take Place In The Conservation Zone Of The Recorded Archaeological Sites. No Need To Conduct Archaeological Research. Keep And Report Possible Archaeological Objects Encountered To The Wielkopolska Provincial Conservator Of Monuments Ul. Pigeon 2, 62-834 Poznań.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7375291f-d2cc-4789-9aed-5fc9c92ece7d.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.