Broken And Crushed Stone - Frame Supply Framework For Career And Ballast For Repairing And Maintaining Non -Modernized Roads In Alba Iulia. The Object Of The Framework Agreement Is The Supply Of Quarry And Ballast Stone For Repairing And Maintaining Non -Modernized Roads In Alba Iulia. The Maximum Estimated Maximum Value Of The Framework For Providing Quarry And Ballast Supply For Repair And Maintenance Of Non -Modernized Roads In Alba Iulia, Is 1,095,000.00 Lei Excluding Vat, Including The Transport Of Products, For A Period Of 24 Months, The Equivalent Of Approximately 25,000 Tonnes, As Follows: As Follows: 0-63 Mm: 1,000 Tonnes X 35 Lei/T = 35,000 Lei Without Vat-Career Crushed 0-31.5 Mm: 3,000 Tonnes X 46 Lei/T = 138,000 Lei-Without Vat-Career Crushed 0-63 Mm: 1,000 Tonnes X 46 Lei/T = 46,000 Lei Without Vat, In Total Value Of 219,000.00 Lei. Maximum Quantities: - Sorted Ballast 0-63 Mm: 2,500 Tonnes X 35 Lei/T = 87,500 Lei - Without Vat - Career Crushed 0-31.5 Mm: 7,000 Tonnes X 46 Lei/T = 322,000 Lei - Career Crouched 0-63 Mm: 3,000 Tons X 46 Lei/T = 138,000 Lei 547.500.00 Lei Excluding Vat, Respectively The Estimated Value, The Highest Subsequent Contract Is 547,500.00 Lei Excluding Vat. Estimated Quantities For 24 Months Minimum Quantities: - Sorted Ballast 0-63 Mm: 2,000 Tons X 35 Lei/T = 70,000 Lei - Without Vat - Career Crushed 0-31.5 Mm: 6,000 Tonnes X 46 Lei/T = 276,000 Lei - Career Crushed 0-63 Mm: 2,000 Tons X 46 Lei/T = 92,000 Lei 438,000.00 Lei Excluding Vat. Maximum Quantities: - Sorted Ballast 0-63 Mm: 5,000 Tonnes X 35 Lei/T = 175,000 Lei Without Vat - Career Crushed 0-31.5 Mm: 14,000 Tonnes X 46 Lei/T = 644,000 Lei - Career Crushed 0-63 Mm: 6,000 Tonnes X 46 Lei/T = T = T = 2, Lei Without Vat. The Estimated Value Of The Framework Agreement In The Amount Of 1,095,000.00 Lei Excluding Vat, In Which The Transport Of The Products Is Included, Was Determined By Applying The Prices Contracted By The Contracting Authority In Similar Contracts. I) The Duration Of The Framework Agreement: 24 (Twenty-Disip); Ii) The Conclusion Method: With A Single Economic Operator; Iv) The Way Of Executing The Framework Agreement: Without Resuming The Competition; V) The Estimated Calendar And The Frequency Of The Award Of The Subsequent Contracts During The Framework Agreement: Vi) The Frequency And The Value Of The Contracts To Be Awarded: During The Period Of The Framework Agreement The Contracting Authority Intends To Award Subsequent Contracts Consisting Of The Supply Of Stone Crushed By The Career Alba Iulia Municipality According To The Provisions Of The Specifications. Information Regarding The Conduct Of The Agreement - Framework: The Frequency And Value Of The Contracts To Be Assigned (If Known): Annual, Or Whenever It Will Be Necessary