3 The Subject Of The Contract Was Accurately Described In Annex 1 To Swz - Description Of The Subject Of The Contract. 3. Separators During The Performance Of The Guilt Cleaning Service Will Be Protected Against Access By Bystanders. After Performing The Service, Separators Will Be Available To All Users In The Field Of Rainwater And Snowmelt Drainage From The Road Surface. The Contracting Authority Does Not Specify The Requirements For Availability For Disabled People, Because Cleaning Separators Determines The Nature Of This Order In Which The Direct Use Of Separators Applies Only To Contractor Employees. 4. Type Of Order: Services. 5. Cpv Codes: 1) Main Cpv Code: 90640000-5: Services Of Cleaning And Emptying Sewage Channels; 2) Additional Cpv Codes: 90641000-2: Sewage Channel Cleaning Services; 90642000-9: Sewage Channel Emptying Services. 6. The Employer Does Not Reserve The Obligation To Perform Personal Tasks By The Contractor In Person, In The Manner Specified In Art. 121 Of The Pzp Act. 7. The Contractor May Entrust The Performance Of Part Of The Subcontractors Order. The Contracting Authority Requires The Contractor To Indicate, In The Offer, Parts (Ranges) Of The Order, Which He Intends To Entrust To Subcontractors, And The Contractor Provides The Names Of Any Subcontractors, If They Are Already Known. To This End, The Contractor Should Provide Relevant Information In The Offer Form, Constituting Annex 2 To Swz. In The Event That The Contractor Does Not Intend To Perform The Order With The Participation Of Subcontractors, Enter The Not Applicable Or Other Similar Wording In The Right Place In The Table. 8. Entrusting The Performance Of Part Of The Order To Subcontractors Does Not Release The Contractor From Liability For Proper Performance Of The Contract. 9. The Contracting Authority Divided The Order Into Parts By Awarding The Contract In Two Separate Proceedings. The Employer Believes That The Further Division Of The Contract In This Procedure Will Not Be Made For Technical, Organizational And Economic Reasons. Considering The Fact That The Task To Be Performed Is Technically Difficult, And The Division Would Cause Difficulties In Its Implementation, E.G. In The Coordination Of Works In Roads During High Traffic Intensity, Which, As A Result, Would Disturb The Intended Final And Material Result.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.