Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
24-03-2025
Work Detail
Quotation are invited for D Ph2 Boiler Feed Pump (3 Nos ) Overhauling Inspection. SCOPE OF WORK AND TECHNICAL REQUIREMENTS {CONTRACTORS SCOPE)THE SCOPE OF WORK AND TECHNICAL REQUIREMENTS OF THE PUMPS ARE ASMENTIONE D BELOW: SECTIONAL DRAWINGS AND TECHNICAL DETAILS ARE FURNISHED1)#COLLECT AND RECORD ALL PRE-SHUTDOWN DATA OF THE PUMPS WHICH SHALLI NCLUDE ALL THE PARAMETERS SUCH AS SUCTION AND DISCHARGE PRESSURE,VIBRATION READINGS, MOTOR CURRENT ETC.2)#DECOUPLE MOTOR AND PUMP BY REMOVING COUPLING BOLTS AND REMOVE PIPINGCONNECTIONS (MOTOR DISCONNECTION AND REMOVAL BY DEWA IF REQUIRED).3)#TRANSPORT THE PUMP TO SERVICE PROVIDERS WORKSHOP OR AT FACILITIESAT DEWA PREMISES. PUMP INSPECTION AND OVERHAUL1)#DISMANTLE THE PUMP AS PER OEM MAINTE NANCE PROCEDURE.2)#CLEAN, INSPECT EACH COMPONENT. CHECK FOR WEAR, EROSION, CORROSION,SCORING, CRACKS ETC. FOR ALL COMPONENTS AND REC ORD ALL FINDINGS.3)#MEASURE AND RECORD ALL DIMENSIONS AND CLEARANCES AND COMPARE WITHTHE OEM MAXIMUM AVAILABLE TOLERANCES4)#CHECK TH E RUN OUT OF THE SHAFT (SHALL BE STRAIGHTENED IF REQUIRED)AND ROTOR (SHALL BE MACHINED IF REQUIRED) COMPARE WITH OEMS MAXIMUMAVAILAB LE TOLERANCES.5)#PREPARE AND SUBMIT A DETAILED INSPECTION REPORT TO DEWA MAINTENANCEPERSONNEL WITHIN TWO WORKING DAYS FROM RECEIPT O F THE PUMP. INSPECTIONREPORT SHALL INCLUDE ALL AS FOUND DETAILS, RECOMMENDATIONS FOR REPAIR,REPLACEMENT SPARE PARTS AND UPGRADES.6)# SERVICE PROVIDER SHALL PROCEED FOR THE OVERHAUL OF THE PUMP AFTERGETTING RESPONSE/CLEARANCE FROM DEWA MAINTENANCE SECTION. DEWA WILL PROVIDE REQUIRED MUTUALLY AGREED UPON SPARE PARTS BASED ON THEINSPECTION REPORT AND DEWA ENGINEERS INSPECTION AND COMMON CONSUMABLES SHOULD BE ARRANGE FROM SERVICE PROVIDER.7)#THE PUMP CASINGS/MAJOR PARTS SHALL BE CLEANED THOROUGHLY TO REMOVETHE SCALE FORMATIONS IN TERNALLY AND EXTERNALLY AND A SUITABLE PAINTCOATING SHALL BE APPLIED. CLEANING CAN BE DONE WITH GRIT BLASTING.8)#MAJOR REPAIR WORKS IF ANY SHALL BE CARRIED OUT AFTER APPROVAL FROMDEWA AT AN EXTRA COST AGREED.9)#WEIR RING FIXING (IF REQUIRED) AND MAINTAIN THE CLEAR ANCE, SKIMMACHINING WILL BE CARRIED OUT BY THE SERVICE PROVIDER WITHOUT ANYADDITIONAL COST.10)#COMPLETE PUMP ROTOR SHALL BE DYNAMICA LLY BALANCED AT THE SERVICEPROVIDERS WORKSHOP AND REPORT TO BE SUBMITTED.11) Qty: 3 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332500738)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.