GTR 94084950
Tenders Are Invited For Construction Of Industrial Control Software Development Services - Reactor Physics Software Systems
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
94084950
Tendering Authority
Subscribe to view
Tender No
169310-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of Industrial Control Software Development Services - Reactor Physics Software Systems
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
27-03-2025
Closed
Work Detail
Construction Of Industrial Control Software Development Services - Reactor Physics Software Systems. 1. Task 2 Description Of The Technical Plan And Jury. The Technical Plan (System Plan) Must Be Described In The Current Calculations And Clearly Define The Development Of The New Software System: • Basic Guidelines, • Software Device Base, • The Components To Be Established And Their Reactor Physics, Mathematical Background, • Relationships, • Connections With External System Elements, System). The Technical Plan Should Also Provide A Clear Guidance On How To Prove The Adequacy Of The New System, Taking Into Account The Above. 2.2. Developing And Approving The Detailed Development Plan For The New Software System. 2.3. In The First Phase According To The Development Plan, The Creation Of A New Program That Is Capable Of Off-Line For Filling, Campaign-Tracking Calculations And Simpler Security Analyzes For Certain Campaigns Can Be Incorporated Into Online Zone Monitoring Systems (Minimum Technical Requirement). Off-Line Testing Of The Program. 2.4. The Second Phase Of The Development Plan Must Be Created And Tested In An Off-Line Way: 2.4.1. A New Program That Is Capable Of Controlling The Reactor Physics Calculations Of The On-Line Zone System, Processing Incoming Measurement Data, And Conveying The Resulting Results To Higher Processing Levels, Display, 2.4.2. A New Program That Is Capable Of Controlling The Reactor Physics Calculations Of The Transhipment Neutron Monitoring And Reactivity Monitoring System, Processes The Measured Detector Signals And Transmitted The Calculated Results To The Display Level. 2.5. In The Third Phase Of The Development Plan, An Expert Program Package Should Be Created That Allows The Filling Plan And The Transfusion Plan To Create Databases For The Above Programs, Processing Measured Campaign Data For Testing Off-Line Programs And The Production Of Campaign History. Testing The Program Package Off-Line. 2.6. In The Fourth Phase Of The Development Plan, The Software Elements Should Be Created That Allow The Newly Prepared Reactor Physics Software System To Control Off-Line And Online. In Addition, The Simulator Specific Functions Of The On-Line Zone Monitoring System Need To Be Prepared. Testing Software Elements And Simulator Specific Features (Manufacturing Test - Fat). 2.7. The New On-Line Zone Monitoring System And The Transmission Neutron Control And Reactivity Monitoring System Are Commissioned, Launching On-Line Testing (Sat Level Test, Trial) In Parallel With The Current Verona And Anerem System. Continuous Check And Evaluation Of Test Results (Ticket
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
28dd1833-5f4e-4f13-bd66-690e1227d9eb.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.