Expression of Interest for Feasibility Study for the Luapula Hydro Power Plant The Consultant shall have: 15 years specific experience in hydropower, dams and transmission projects. Prepared feasibility studies and led geotechnical investigations for at least 5 large hydropower and dams projects (above 100 MW). Have successfully carried out at least two similar assignments funded by international financing institutions. Have proven experience in multidisciplinary consulting services in engineering, project management, environmental management and development activities in all stages of project implementation (from pre-feasibility to commissioning and completion of the works). The firm should be able to field highly experienced multinational teams, covering at a minimum, areas such as: Team Leader Senior Hydropower Expert; Hydropower Engineer; Dam Engineer; Geotechnical Engineer; Civil/Structural Engineer; Electro-mechanical Engineer; Transmission and Substation design Engineer, Hydrologist, Energy Economist; Power systems analysis expert; and Solar PV expert. Interested consultants may obtain further information and detailed Terms of Reference at the address below during office hours. Expressions of interest must be delivered to the address below in person or email by 28 March 2025 at 15:00 hours Central African time and mention Expression of Interest for Consultancy Services to undertake Feasibility Study, Conceptual Design and Bidding Documents for the Luapula Hydro Power Plant.. Tender Link : https://www.afdb.org/en/projects-and-operations/procurement
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.