GTR 94041802
Bids Are Invited For Hiring A Specialized Company For The Execution Of Engineering Work For The Construction Of Basic Health Unit (Ubs), In Meeting The Needs Of The Municipal Health Secretariat Of The City Of Terra Nova/Pe, Through The Release Of Resources From The Growth Acceleration Program (Pac), Proposal No. 11196.7250001/24-002, To Foster The Structuring Of Local Health Systems And The Guarantee Of Universal, Equitable And Integral Health Care, Promotion, Promotion, Promotion And Health Recovery, Acting Directly And Indirectly In The Health/Disease Process Of The Local Population
ICB — International Competitive Bid
Closed
South America
Tender Information
GTR Reference
94041802
Tendering Authority
Subscribe to view
Tender No
11001/2025
Financer Name
Self-Funded
Work Title
Bids Are Invited For Hiring A Specialized Company For The Execution Of Engineering Work For The Construction Of Basic Health Unit (Ubs), In Meeting The Needs Of The Municipal Health Secretariat Of The City Of Terra Nova/Pe, Through The Release Of Resources From The Growth Acceleration Program (Pac), Proposal No. 11196.7250001/24-002, To Foster The Structuring Of Local Health Systems And The Guarantee Of Universal, Equitable And Integral Health Care, Promotion, Promotion, Promotion And Health Recovery, Acting Directly And Indirectly In The Health/Disease Process Of The Local Population
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
South America
Political Region
BRIC,G20
Last Date of Bid Submission
01-04-2025
Closed
Work Detail
Closed Shed Small Size For Cement And Warehouse Deposit (S38, 72 M2) With New Materials, Open Shed For Production Support (Carpentry, Frame Center, Workshop, Etc.) W/ Scissors, 4Mm Tile, Repointed Concrete Floor, Container Rental - Bathroom With Showers And Vessels - 4, 30 X 2, 30M, Work -On -The -Dullers Bar Water Measurement - Individualized Inlet, In Cpvc Dn 28 Mm (1), For 1 Meter - Supply And Installation (Exclusive Hydrometer). Af_03/2024, 14/03/2025, 1/2, 1, 5 M3/H - Supply And Installation Hydrometer. Af_03/2024, Entry Of Electricity, Air, Three -Phase, With Built -In Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Not Included The Concrete Pole). Af_07/2020_Ps, Supply And Installation Of Workplate With Galvanized Plate And Wood Structure. Af_03 / 2022_Ps, Load, Maneuver And Discharge In 10 M³ Tilting Truck - Hydraulic Excavator Load (0, 80 M³ / 111 Hp) And Free Discharge (Unit: M3). Af_07/2020, Siding With Metal Tile. Af_03/2024, Junior Working Civil Engineer With Complementary Charges, Mobilization And Demobilization Of Urban Center Or Bordering Region Between 1,000,000, 01 And 3,000,000, 00 (0, 30%), Fachadeiro Metal Scaffolding Late, Pieces Of Approximately 1, 20 M Wide And 2, 0 M High, Including Diagonals In X, Shoe Bars And Other Items Assembly, Including Assembly And Disassembly, Conventional Work Lease, Using Pontaletaded Boards Every 2.00M - 2 Uses. Af_03/2024, Mechanized Excavation Of Ditch With Prof. Up To 1, 5 M (Average And Downstream/A Composition Per Stretch), Retroescav. (0, 26 M3), Width. From 0, 8 M To 1, 5 M, In 1St Category Soil, In Places With High Level Of Interference. Af_02/2021, Manual Ditch Excavation With Depth Less Than Or Equal To 1, 30 M. Af_02/2021, Ballast With Granular Material (Crushed Stone N.1 And Stone Crushed N.2), Applied To Floors Or Slabs On Soil, 10 Cm Thickness. Af_01/2024, Manufacture, Assembly And Disassembly Of Crowning Block, Sawed Wood, E25 Mm, 4 Uses. Af_01/2024, Block Frame Using 5 Mm Ca -60 Steel - Assembly. Af_01/2024, Block Frame Using 6, 3 Mm - Assembly Ca -50 Steel. Af_01/2024, Block Frame Using 8 Mm Ca -50 Steel - Assembly. Af_01/2024, Block Frame Using 10 Mm Ca -50 Steel - Assembly. Af_01/2024, Block Frame, Isolated Shoe, Baldrame Beam And Running Shoe Using 12, 5 Mm Ca -50 Steel - Assembly. Af_01/2024, Baldrame Beam And Shoe Running Using 16 Mm Ca -50 Steel - Assembly. Af_01/2024, Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using Pump - Launch, Densification And Finishing. Af_01/2024, Spreading Material With Treadmill Tractor. Af_11/2019, Manual Ditches, With Percussion Soil Compactor. Af_08/2023, Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Technological Control Of Concrete, Assembly And Disassembly Of Rectangular Pillars And Similar Structures, Simple Ceiling Height, Resin Compensated Wood Plate, 6 Uses. Af_09/2020, Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using Ca -50 Steel Of 10, 0 Mm - Assembly. Af_06/2022, Pillar Frame Or Beam Of Conventional Reinforced Concrete Structure Using 12, 5 Mm Ca -50 Steel - Assembly.
Key Value
Tender Value
2,071,755 - BRL
Tender Documents
Global Tender Document
57882baa-3573-476f-a1aa-c17af3da1f7c.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.