Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
19-03-2025
Work Detail
Quotation Are Invited For Maintenance And Servicing Of Marine Loading Arm-02 1-1032501246 Marine Loading Arm-02 Srvc Maintenance And Servicing Of Marine Loading Arm-02 In Jafza Area. Dewa Contact Person Gopal Tewari, Phone:0508806977, Gopal.Tewari@Dewa.Gov.Ae And Rashid Almalek:055-5955899 Rashid.Almalek@Dewa.Gov.Ae 1 Item-00001 Contractor Scope Of Work:--On Site Maintenance, Inspections & Testing Of Mfo Transfer Marineloading Arm (Mla-02) With Associated Equ Ipment At Tanker Berth No.02,Jafza Area.Mla-02 Details Are As Follows-Loading Arm Size: Ø12# X 46#,Flued: Mfo,Manuf: M/S Fmc,Operati On: Manualquantity: 01No.Contractor Terms & Conditions: --On Site Maintenance, Internal Inspections & Testing As Per Attachedscope O F Work At Tb-02, Jafza# Complete Job Details Are As Follows.1.#The Prospective Bidders Shall Visit The Site To Understand Thesystem And It#S Function, Pressure And Temperature For Selection Ofsuitable Tools & Fitting Material Including Measurements.2.#Site Visit Shall Be Arranged With Prior Appointment. Dewa Will Notaccept Any Claim For Extras Beyond The Order Rates/Prices During Andafter The Execution Of Work Ordered. There Will Be One Dewaengineer/Foreman For Contractor Support.3.# Contractor Must Have Previous Experien Ce With Mla And Working Experience Within Jafza Area Or Other Tanker Berth Area.4.# Mobilize Equipment With Manpower Along With All Tools, Ppe#S And Safety Equipment.5.# Contractor Must Submit Method Statement And Risk Assessment Prior To Starting The Job To Apply Ptw.6.# Cover The Adjacent Equipment, Other Electrical Fittings & Instruments From Direct Spillage Of Grease Or Water.7.# Checking The Existing Condition As Per Dewa Check List.8.# Pre-Inspection Of Complete Mla Observe The Unit And Record The Working Condition Parameters And Mark The Leakage Points With Detailed Report.9.# Removal, Servicing/Greasing And Testing Of All Spares Including Valv Es (Below 6Inches), Pullies And Pumps.10.# Inspection Of All Hydraulic Hoses And Replacement Of Hoses (If Found Damage).11.# Greasi Ng Of All Moving Parts Which Require Grease Due To Dried Up,Grease Became Old Or Gone Due To Oozing Out.12.#Msds Of Grease Or Any Ki Nd Of Cleaning Oils To Be Submitted Beforeuse.13.# De-Greasing And Cleaning Of Non-Greasing Surface By Suitableliquid With Hb2 Stan Dard Grade.14.#Dirty & Hidden Area To Be Cleaned Mechanically/Manualexternal Surface Preparation By Brushing Or Cloth As Suggested B Y Dewaengineer To Sa2.15.# Mope And Dry The Surface After Complete Application.16.# Protection To Be Taken Care On Suggested Area/Po Rtions.17.#Anticorrosive Primer To Be Applied Immediately Wherever Required.18.#Final Operational Inspection And Submission Of Job C Ompletionreport.19.#Complete Housekeeping & Mla Area Site Cleaning.20.#De-Mobilization And Housekeeping Of Complete Area.21.#Noc Fro M All Involved Departments Request With Documents, Approvalsand Jafza Authoritys Requirements Such As Performing Authority, Ehstrai Ning...Etc Will Be In Contractor Scope.General Conditions:--1.#All Dewa & Jafza Safety & Environment Policy, Rules And Regulationssh All Be Followed At Work Site During The Contract Period.2.#All The Safety Requirements Shall Be Promptly Fulfilled.3.#All The Workme N Should Wear The Uniform, Safety Shoes And Helmetwhile On Work. The Technicians Shall Bring With Them Their Personaltoolboxes.4.#The Contractor Is Not Allowed To Keep Inflammable Or Explosivesubstances In The Tanker Berth Areas.5.#The Contractor Shall Comply The Firefighting Regulation. Smoking Isnot Allowed Within The Premises.6.#Any Accident Or Injury To Personnel Will Be Entirely To Contra Ctor#Sresponsibility.7.#Working Hours On Weekdays From Monday To Thursday Should Be Planned Between 07.30 Hrs. To 16.30 Hrs. Sat Urday & Sunday Will Be Off. Friday Work Is Planned Between 07:30 ~ 12 Noon Only.8.#The Contractor Should Obtain Permit In Th E Prescribed Dewa Format For Extended Hours, Night Shift Or Holidays For Work.9.#The Contractor Should Submit Time Schedule Bar Chart Indicating Each Activity.10.#Schedule Of Shutdown Will Be Informed In Advance.11.#Job To Be Completed Within Schedule. 12.#Workmanship Warranty Is 06Months After Completion Overhauling.Dewa Scope:--1.#Removal Of Electric And Control Cables By Emd And I&C.2.#Material Gate Passes.3.#Specific Spares (Hardware) Will Be Supplied By Dewa.4.#Contact Person Gopal Tewari, Phone:0508806977, Gopal.Tewari@Dewa.Gov.Ae And Rashid Almalek:055- 5955899Rashid.Almalek@Dewa.Gov.Ae 1 Ea Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332500704)/$Value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.