GTR 93841545
Tenders Are Invited For Modernization Of Municipal And Internal Roads In The Oświęcim Commune - Part I
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
93841545
Tendering Authority
Subscribe to view
Tender No
WI.2712.4.2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of Municipal And Internal Roads In The Oświęcim Commune - Part I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
27-03-2025
Closed
Work Detail
Subject: Modernization Of Ul. Gościnna In Zaborze At Km 0+524 - 0+921 1. Description Of The Subject Of The Contract: A) Milling Of The Existing Pavement B) Tricking Along With The Export And Utilization Of The Urobkuc) Making The Road Structure By Stabilizing The Ground With Cement (2.5-5 Mpa) D). Making A Relaxing Layer From Crushing. 15 Cme) Location Of Asphalt Concrete Surface With A Total Thickness Of 9 Cm (5 Cm. Binding Layer + 4 Cm Cover Layer) F) Making Roadside G) Modernization Of The Bus Bay Together With Platform H) Renovations Of Conventions 2. The Detailed Scope Of Works Includes Project Documentation, Technical Specification Of The Execution And Acceptance Of Works, Performance Of Works. 3. Rules For Performing The Subject Of The Contract, In Particular: 1) Obligations Of The Parties; 2) Participants Of The Investment Process; 3) Deadlines4) Rules For The Performance And Settlement Of Works; 5) Suspension Of Works; 6) Types Of Acceptance And Rules For Their Conduct; 7) Quality Control - Disclosure And Removal Of Defects And Defects; 8) Contractual Penalties; 9) Contractors Remuneration And Payment Principles; 10) Changes; 10) Changes; They Were Specified In Detail In The Relevant Provisions Of The Contract - Annex 8 To Swz.4. The Warranty - The Length Of The Warranty Period And Warranty For Completed Construction Works As Well As The Supplied And Built -In Materials Is A Minimum Period Of 60 Months, And The Maximum Period Of 72 Months From The Signing Of The Non -Adhesive Final Acceptance Protocol. Above The Period Is A Criterion For Evaluation Of Offers. 5. The Contractor Is Obliged To Draw Up A Simplified Offer Cost Estimate In Accordance With The Attached Work Pre -City On The Principles Set Out In Point 20.3 Swz.6. The Contractors Remuneration Is Cost-And-Billing.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e2bb1a8a-ab81-4636-90ed-2598dfd4a7f6.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.