GTR 93649936

Tenders Are Invited For Electrical Installation Work - Component C2 - Modernization And Amplification Of The Network By Replacing The Existing Power Transformers With Rat Power Transformers, In The Area Predominated By Prosumers

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
93649936
Tendering Authority
Subscribe to view
Tender No
150583-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Electrical Installation Work - Component C2 - Modernization And Amplification Of The Network By Replacing The Existing Power Transformers With Rat Power Transformers, In The Area Predominated By Prosumers
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union
Last Date of Bid Submission
14-04-2025 Closed
Work Detail
Electrical Installation Work - Component C2 - Modernization And Amplification Of The Network By Replacing The Existing Power Transformers With Rat Power Transformers, In The Area Predominated By Prosumers. In Accordance With The Documents Prepared By The Specialized Service, The Necessity Report Registered With No. Deer/40234/13.02.2025, By The Investment Monitoring Department And At The Purchase Operations Service With No. Deer/56600/26.02.2025, The Acquisition Of Works Is Requested: Component C2 - Modernization And Amplification Of The Network By Replacing The Existing Power Transformers With Rat Power Transformers, In The Area Predominated By The Projects Related To The Project Red Modernization And Implementation Of A Virtual Power Plant Type System At The Level Of The Company Electrica Electrica Sa. The Contracting Entity, Obtained A European Financing Through The Financing Program The Modernization Fund 3 Modernization And Construction Of New Sections Of Energy Infrastructure Investment Measure 3.2. Supporting Investments For The Extension And Modernization Of The Electricity Distribution Network, Falling Into The Financing Actions And Obtaining Following The Implementation Of The Project The Expected Results, The General Objective Being: Improving The Quality Parameters Of The Electricity Distributed In The Area And Of The Performance Indicators Of The Distribution Service. At The Level Of The Regional Structures Of The Deer, In Areas With A High Concentration Of Prosumers, Works Will Be Carried Out To Modernize The Electrical Network And Capacity Increase, Upstream Of The Connection Point, Of The Prosumers, Necessary To Ensure The Technical Conditions In Order To Evacuate Or Consume The Additional Power Approved For The Connection Of The Prosumors, To The Modernization, To The Modernization, To The Work. The Distribution Network By Replacing 284 Pcs. Distribution Transformers With New Ones, Provided With Automatic Voltage Adjustment, In Areas With A Significant Weight Of Prosumers In Deer Operating Areas, And Mounting A Number Of 270 Rtu Type Equipment In The System With Impact On The System. Thus, The Present Project Allows The Management Of Energy Flows, Estimating The State Of Operation, When Detecting Critical Situations, And Taking Measures To Prevent Congestion Situations (Energy Imbalance) Or Interruption Of The Operation.
Key Value
Tender Value
67,930,075 - RON
Tender Documents
Global Tender Document
30c55e82-9398-4776-b88c-b394b1cce3e3.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders