Architectural, Construction, Engineering And Inspection Services-Expert Engineering, Zimmerberg-Basistunnel 2 (Zbt2). The Sbb Has Awarded A General Planner Mandate For The Sia Parts Phases 32-53 For The New Zimmerberg Base Tunnel 2 (Zbt2). The Tunnel Is Approximately 10.8 Km Long And Consists Of Two Pouring Tubes. These Connect To The Zimmerberg Base Tunnel 1 And Extend To The Southern Portal Litti Near Baar. The Project Is Divided Into The Following Areas: • Nidelbad • Tunnel • Deinikon/Litti The Services For The Expert Mandate Engineering Comprehensive The Departments Include Tunnel Construction, Fundamental And Special Deep Construction, Geotechnical And Support Structures. They Contain The Testing Of The Relevant Tunnel Buildings And Associated Engineering Buildings In Nidelbad And In The Area Of The Litti Portal According To The Bav Directive Independent Test Points Railway (Rl Up-Eb) In The Sia Section Phases 32/33 (Construction Project/Edition Project) As Well As The Further Examination And The Professional Support Of The Sbb During The Sia Section Phases 51/52 (Execution Project/Execution).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.