GTR 93367651

Quotation Are Invited For Insulation, Cladding Removal & Re-Fixing During Integrity Inspections Of Gt Ignition Tanks 10 & 20 At H-Station

ICB — International Competitive Bid Closed Asia
Tender Information
GTR Reference
93367651
Tendering Authority
Subscribe to view
Tender No
2332500623
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Insulation, Cladding Removal & Re-Fixing During Integrity Inspections Of Gt Ignition Tanks 10 & 20 At H-Station
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
06-03-2025 Closed
Work Detail
Quotation are invited for Insulation, Cladding Removal & Re-Fixing during Integrity Inspections of GT Ignition Tanks 10 & 20 at H-Station. REMOVAL & RE FIXING OF INSULATION AND CLADDING SHEET DURINGINTEGRITY INSPECTION OF GT PROPANE TANK 10 AT H STATION, PHASE III,ALAWEE RCONTACT PERSON: KANDILMOBILE NO. 05287570921.#PRE-BID SITE INSPECTIONØ#THE CONTRACTOR SHALL VISIT THE SITE AND MAKE THEMSELVES FULL YFAMILIAR WITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES,ETC., BEFORE SUBMITTING THE BID. DEWA WILL NOT ACCEPT ANY CLAI M FOREXTRAS BEYOND THE ORDER RATES / PRICES DURING AND AFTER THE EXECUTION OFWORK ORDERED.2.#QUALIFICATION OF BIDDERØ#THE BIDDER SHA LL HAVE PROVEN EXPERIENCE FOR SIMILAR JOBS3.#SCOPE OF WORKØ#MOBILIZE MANPOWER, EQUIPMENT, TOOLS, ETC. WITHIN 24 HRS. OF ADVANCENOTIC E.Ø#COLLECT PTW (PERMIT TO WORK) AND LC (LINE CLEARANCE) DOCUMENT FROMDEWA.Ø#THE FOLLOWING DOCUMENTS TO BE SUBMITTED FOR PTW,O#METHO D STATEMENTO#RISK ASSESSMENT OF THE WORKO#TOOL BOX TALK REPORT.Ø#REMOVE THE CLADDINGS AND INSULATION AS PER DEWA ENGINEER#SINSTRUCTI ON.Ø#THE CLADDINGS AND INSULATION TO BE REMOVED FROM ENTIRE PROPANE TANK.Ø#ONLY NON-SPARKING TOOLS ARE ALLOWED DURING REMOVAL / FIXI NG OF THECLADDINGS AND INSULATIONS.Ø#THE CLADDINGS AND INSULATION (PATCH WISE) FROM PIPES AND EQUIPMENT ASREQUIRED FOR THE THICKNESS MEASUREMENT /NDT INSPECTION.Ø#AFTER THICKNESS MEASUREMENT / NDT & INSPECTION, CONTRACTOR HAS TORE-FIX THE INSULATION AND CLADDING.Ø #KEEP THE REMOVED INSULATIONS AND CLADDING SHEETS IN SAFE LOCATIONS.Ø#INTIMATE DEWA PERSONNEL IN CASE OF ANY ABNORMALITIES / DAMAGES FOUNDIN THE CLADDING SHEETS.Ø#INSTALL THE NEW INSULATION BLANKETS AFTER COMPLETION OF THE THICKNESSSURVEY.Ø#CONTRACTOR SHALL RECTIF Y ANY ABNORMALITIES / DEFORMATION FOUND IN THECLADDING SHEETS.Ø#IN CASE OF COMPLETE DAMAGE OF THE CLADDING SHEETS, CONTRACTOR WILLSU PPLY NEW CLADDING SHEETS, FABRICATE AND FIX THE CLADDING SHEETSACCORDING TO SITE CONDITIONS.Ø#RE FIXING OF INSULATION AND CLADDING T O BE DONE ONLY AFTER DEWAENGINEER#S CLEARANCE.Ø#FIX THE CLADDING SHEETS AND ENSURE THAT ALL THE FIXING SCREWS /RIVETS ARE PROPERLY I NSTALLED.Ø#HOUSEKEEPING OF THE AREA TO BE DONE ON DAILY BASIS AND DISPOSEINSULATION SCRAP AS PER DEWA INSTRUCTION.Ø#JOB COMPLETION A CCEPTANCE IS SUBJECT TO DEWA PERSONNEL INSPECTION ANDVERIFICATION.Ø#SUBMIT WORK COMPLETION REPORT WITH CLEAR PHOTOS.Ø#PAYMENT WILL B E MADE AS PER ACTUAL AREA OF INSULATION REMOVED AND REFIXED.Ø#ALL THE SCREWS / RIVETS REQUIRED FOR INSULATION CLADDING FIXING WILLBE IN CONTRACTOR SCOPE.4.#EQUIPMENT#S INVOLVED BUT NOT LIMITED TO FOLLOWINGØ#PIPINGØ#PRESSURE VESSEL / TANKØ#VALVESØ#TUBING5.#QUANTITY Ø#AREA 30 M² / EACH TANK6.#CALCULATION OF AREAØ#CIRCUMFERENCE X LENGTH - FOR COMPLETE PIPE & ELBOWSØ#LENGTH X BREADTH # FOR BOX CUTT ING ON PIPE, ELBOWS, PRESSURE VESSELOR ANY OTHER EQUIPMENT ETC.7.#DURATIONØ#MUTUALLY AGREEMENT8.#DEWA SCOPEØ#SCAFFOLDINGØ#ELECTRICIT YØ#WATERØ#INSULATIONS AND CLADDING SHEETS9.#WARRANTY:-Ø#THE MINIMUM WARRANTY PERIOD FOR THE WORK SHALL BE OF ONE YEAR FROMTHE DATE O F COMPLETION OF WORK ACCEPTED BY DEWA. Qty: 1 Insulation, Clading Removal & Refixing during Integrity Inspections of GT Ignition Tanks 10 & 20 at H-Station, Phase III, Al AWEER. STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332500623)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
7456a56d-03f3-471d-8bbb-e90b70fc0b2e.pdf
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.