GTR 93130301
Bids Are Invited For Atlas Park Pond Dredging
ICB — International Competitive Bid
Closed
Northern America
Tender Information
GTR Reference
93130301
Tendering Authority
Subscribe to view
Tender No
PE-65100-NONST-2025-000000027
Financer Name
Self-Funded
Work Title
Bids Are Invited For Atlas Park Pond Dredging
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia-Pacific Economic Cooperation, APEC,APAC (Asia Pacific)
Last Date of Bid Submission
07-04-2025
Closed
Work Detail
The Project Includes Permanently ¿Capping An Area Of Contaminated Soil With Clean Fill And Asphalt. The ¿Cap¿ Consists Of The Construction Of A Parking Lot With A Precast Concrete Boat Ramp. This Project Aims To Remediate A Currently Unusable Contaminated Area And Construct A Public Park In A Future Phase. Work Involves Dredging Material From Existing Ponds, Drying And Property Disposing Of The Material, Clearing And Grubbing, Grading, Drainage, Signage, Striping And Related Erosion Control Activities. Grading Work For The Cap Will Involve Hauling Material From Off-Site As Well As Using On-Site Material.This Project Consists Of Dredging Approximately 1,126 Cubic Yards Of Impacted Sediment Located In Two Sediment Removal Zones. The Top 1-Foot Of Sediment Should Be Removed From The Entire Footprint.The Contractor Will Be Responsible For Selecting The Appropriate Dredging Technique And Placement Of The Dredge Spoils In The Sediment Placement Area Which May Include A Suction Dredging Method And A Pump And Hose Method To Transport The Sediment To The Sediment Placement Area. In Order To Prevent The Migration Of Suspended Sediments Outside Of The Sediment Removal Areas, Contractor Shall Provide And Install A Containment Boom With A Floating Surface Device, Skirt, And Longitudinal Support Prior To Dredging Activities. The Containment Boom Will Be Located Immediately Outside The Limits Of Each Sediment Removal Zone And Will Be Anchored To The Shoreline. The Skirt Will Extend To The Bottom Of The Pond. The Containment Boom Will Remain In Place During All Dredging Activities And Be Routinely Inspected By The Contractor To Ensure It Is Functioning Properly. Note: No Work Shall Take Place In The Areas With Wetlands Present Until A Wetland Permit Is Secured By The County.Note: Erosion Control Plans Are Currently Under Review With Gswcc At The Time Of This Bid. Ec Plans May Be Adjusted Based On Comments Received From Gswcc.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a4304b64-bfcd-45be-ae8c-86c06486970e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.