GTR 92780124
Tenders Are Invited For Construction Work - Design (In The Field Of Srk Industry) And Comprehensive Execution Of Construction Works On The Railway Line No. 104 On The Section C1 Tymbark - Limanowa As Part Of The Project Entitled: Construction Of The New Railway Line Podłęże - Szczyrzyc - Tymbark / Mszana Dolna And Modernization Of The Existing Railway Line No. 104 Chabówka - Nowy Sącz - Stage Ii
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
92780124
Tendering Authority
Subscribe to view
Tender No
104726-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Design (In The Field Of Srk Industry) And Comprehensive Execution Of Construction Works On The Railway Line No. 104 On The Section C1 Tymbark - Limanowa As Part Of The Project Entitled: Construction Of The New Railway Line Podłęże - Szczyrzyc - Tymbark / Mszana Dolna And Modernization Of The Existing Railway Line No. 104 Chabówka - Nowy Sącz - Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
27-03-2025
Closed
Work Detail
Construction Work - Design (In The Field Of Srk Industry) And Comprehensive Execution Of Construction Works On The Railway Line No. 104 On The Section C1 Tymbark - Limanowa As Part Of The Project Entitled: Construction Of The New Railway Line Podłęże - Szczyrzyc - Tymbark / Mszana Dolna And Modernization Of The Existing Railway Line No. 104 Chabówka - Nowy Sącz - Stage Ii. 1 The Subject Of The Contract Is The Performance Of The Following Elements: Design And Execution Of Works For The Task Entitled Demolition Reconstruction, Extension And Construction Of A Building Object Entitled: Railway Line No. 104 Chabówka - Nowy Sącz On The Episode C1 From Km Pro Km Pro No. 622 From Km Of 40+700 To Km Designed 43+198 . The Entire Subject Of The Contract Includes The Implementation Of The Following Elements: 1) Project Documentation, Including: A) Development Of An Executive Project (Srk Industry);, B) Development Of As -Built Documentation, Including Geodetic As -Built Documentation, 2) Works In The Areas Described In Opz And Pfu: A) Surface And Track, B) Dehydration And Hydrotechnical Works, C) External Networks, D) Roads, E) Railway Traffic Control Devices (Srk), F) Devices And Telecommunications Systems, G) Traction Network And Power Supply And Control System, H ) Non -Traction Needs (Lpn); I) Devices And Electricity Systems Up To 1 Kv, J) Engineering Facilities With Accompanying Works, Including A Railway Tunnel With An Evacuation Tunnel And Compounds, K) Perons, Travelers Service Facilities And Cubature Facilities, L) Transitions And Journeys, M) Robots Geological And Geotechnical, N) Works Related To The Implementation Of Elements Of Small Architecture, O) Cutting Of Trees And Shrubs And Works Of The Environmental Industry, P) Any Other Task Necessary To Carry Out In Accordance With Applicable Regulations; 3) Works Consisting In The Construction Of Facilities For Environmental Protection. 4) Conducting The Process Of Assessing The Compliance Of Structural Subsystems In The Scope Covered By The Order At Each Stage (Design, Construction And Final Rehearsals Of The Subsystem) And The Transfer Of Relevant Declarations Of Verification And Verification Certificates For Subsystems. 5) Ensuring A Guarantee Of Quality By Providing Warranty Services For All Systems Provided Under This Order Covering Srk Devices - On The Terms Set Out In Opz And Pfu, Aimed At Ensuring Throughout The Provision Of Services To Access To The Ordered Functional Requirements That Will Be Provided By The Contractor Provided By The Contractor Systems And Safe And Proper Operation Of These Systems, In Particular By Performing All Necessary Maintenance Activities, 6) Ensuring The Warranty Conditions - For The Remaining Scope Of Works Not Covered By Warranty Services. 7) The Interface Option Includes The Implementation Of The Benefits Specified In Chapter 5 Of Volume Iv - Pfu Estimated Changes In The Interfaces - The Interface Option. 2. A Detailed Description Of The Subject Of The Contract Was Presented In The Description Of The Subject Of The Contract Constituting Volume Iii
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
178ec7f5-f7fe-46b2-803a-27a83f4326ea.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.