GTR 92737070
Tenders Are Invited For Applause, Cocks, Valves And Similar Appliances -Euh2stars -7 ”Packer And Trssv Purchase
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
92737070
Tendering Authority
Subscribe to view
Tender No
100849-2025
Financer Name
European Union (EU)
Work Title
Tenders Are Invited For Applause, Cocks, Valves And Similar Appliances -Euh2stars -7 ”Packer And Trssv Purchase
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
13-03-2025
Closed
Work Detail
Applause, Cocks, Valves And Similar Appliances -Euh2stars -7 ”Packer And Trssv Purchase. Transport Contract For Magyar Natural Gas Star Ltd. For The Well -To -Do Workwork To Be Implemented During The Euh2stars Project 7 ”Packer And Trssv, Together With Related Service Services Project Information: European Underground H2 Storage Reference System (Hereinafter: Euh2stars) Consortium Leader Rag Austria Ag, Including Partners, Will Jointly Investigate And Plan The Measures Necessary To Rapidly Boost The Hydrogen Economy Along The Entire Chain Of Value Chain. Within The Framework Of The Euh2stars Project, The Injection Of The Hydrogen Hops Produced And Stored By The Existing Hydrogen Technology Is Implemented Through The Psz-36 Gas Well (Ch Well). The Aim Of The Project Is To Gain Practical Experience With The Hydrogen Underground Storage And Production Process, The Operation Of The Well Structure And Surface Technology Through Two Storage Cycles Through 2 X 100,000 Nm3 Pure Hydrogen And Then 100 000 Nm3 Of Natural Gas Hydrogen. During The Implementation Of The Project, The Well Structure Of The Psz-36 Gas Well (Ch Well) Will Be Restructured, Since, According To Pre-Performed Tests, This Well (Ch Well) Is Best Suited For The Operation In The 30 Mm3 Storage In The 30 Mm3 Storage. The Current Well Structure Is Partially Preserved, As The Sand Filter Is Not Replaced, As Operating Experience Does Not Justify It (There Was No Sand Production). Design Parameters • Pressure Range 85-120 Barg • Design Temperature: 0… + 88 ° C • Gas Quantities O Storage Capacity (100 Mol% Hydrogen) 200-800 Nm3/H O Storage Capacity (Expected 20 Mol% Hydrogen + 80 Mol% Natural Gas) 400-1000 Nm3/H • Layer Production 30-1000 Liters/Hour Annex 1 To This Technical Content Analysis Of The Composition Of The Gas Stored On The Well And The Laboratory Analysis Of The Produced Water. The Fittings To Be Installed Must Comply With All The Operating Conditions Set Out Above Above, Maintaining Safe Operation. The Technical Specification Of The Well-Building Materials Is As Follows: 1, 7 ”Packer A, Hydraulic Planted, Recoverable-Producing Packer Installation, Planting: Packer Without Sealing (One Installed) Connected To The Final Fitting With A Production Pipe Mechanism, Planting By Raising The Pressure Of The Productive Tube (Without Translation Or Moving). Building: Dragon -Soluble Design (Packer Is Soluble For Pulling The Production Tube In The Well, Which Can Be Solved Afterwards) • Lining Tube Size: 7 ”32# • Pacher Size: Max. External Diameter: 5.93 ”(150.62 Mm), Min. Inner Diameter: 2.897 ”(73.58 Mm) • Packer Lower Connection Type: 3 ½” 9.2# Vam21 Dad • Packer Upper Connection Type: 3 ½ ”9.2# Vam21 Mother • Material: 41Xx Low
Key Value
Tender Value
70,000,000 - HUF
Tender Documents
Global Tender Document
ca8cac43-0bb1-40f3-ab68-06b66023061c.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.