GTR 92451025

Tenders Are Invited For Construction Work - Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line 202 As Part Of The Project Entitled: Plot On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii.

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
92451025
Tendering Authority
Subscribe to view
Tender No
91862-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line 202 As Part Of The Project Entitled: Plot On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
21-02-2025 Closed
Work Detail
Construction Work - Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line 202 As Part Of The Project Entitled: Plot On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii.. The Subject Of The Contract Is: Design And Execution Of Construction Works On The Section Gdynia Chylonia - Lębork Railway Line No. 202 As Part Of The Project Entitled: Works On The Railway Line No. 202 On The Section Gdynia Chylonia - Słupsk - Phase Ii. The Entire Subject Of The Contract Includes The Implementation Of The Following Elements: The Basic Scope Of The Contract Includes: 1. Development Of Project Documentation, Including: A) Construction Project, B) Executive Projects With The Bill Of Quantities And Stwiors, C) Obtaining Water Permits, D) Obtaining A Decision On Environmental Conditions Environmental Impact, E) Obtaining A Decision To Determine The Location Of The Railway Line And/Or Decision To Determine The Location Of The Public Purpose Investment, F) Obtaining A Building Permit And Other Necessary Administrative Decisions, G) Performing Necessary Estimated Reports To Pay Compensation For Purchased Real Estate ( Land, Buildings), H) Developing As -Built Documentation, Including Geodetic As -Built Documentation, 2. Construction Works In The Following Areas: A) Expansion Of The Line On The Entire Section To The Two -Track System, B) Reconstruction Of The Tracks In Order To Adapt Geometry To Conduct Passenger Trains At Speed Up To 200 Km/H And Freight Trains At A Speed Of Up To 120 Km/H, C) Building New Railway Control Devices (Srk), D) Telecommunications Equipment And Systems, E) Traction Network With Power Supply, F) Devices And Electricity Systems For 1 Kv, G) Construction, Reconstruction Of Engineering Facilities, H) Cubature Platforms And Facilities, I) Construction Of New Passenger Stops, J) Passages And Journeys, K) Liquidation Of The Intersections Of The Railway Line With Roads In The Level Of Rails, L) Geology And Geotechnics 3. Implementation Of Works Consisting In The Construction Of Facilities For Environmental Protection. 4. As -Built Documentation, Including: A) Developing Technical Regulations, In Cooperation With The Employer, Based On The Ir -3 Instructions, After Completion Of Construction Works, In The Scope Of All Industries, B) Developing Geodetic As -Built Documentation: - Line Picket And Longitudinal Profile Kolejowa, - Hand -Over Protocols Of Track Axis Adjustment Marks, - Numerical Situational And Severity Map With A Geodetic As -Built Inventory, C) Conducting The Process Of Assessing The Compliance Of Subsystems And Transferring Relevant Declarations And Certificates In For Subsystems, D) Developing Documentation And Basic Railway Measurement And Basic Railway Measurement Geodetic And Special Railway Warp, E) Developing New Traffic Patterns And Expedition Points. 5. Conducting The Process Of Assessing The Compliance Of Structural Subsystems In The Scope Covered By The Order At Each Stage (Design, Construction And Final Rehearsals Of The Subsystem) And Transferring Relevant Declarations Of Verification And Verification Certificates For Subsystems. The Interface Option Includes: The Implementation Of The Benefits Specified In Chapter 5 Of Volume Iii - Pfu Expected Changes In The Field
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
1db59a69-df75-41ce-9a40-574a1d33b6fd.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders