GTR 92292880
Tenders Are Invited For Industrial Units Construction Work- Establishment Of A Biomass Firing And Biogas Preparation System At The Weißenfels Composting Plant 5: Biogas Treatment Plant Bgaa
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
92292880
Tendering Authority
Subscribe to view
Tender No
85002-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Industrial Units Construction Work- Establishment Of A Biomass Firing And Biogas Preparation System At The Weißenfels Composting Plant 5: Biogas Treatment Plant Bgaa
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
05-03-2025
Closed
Work Detail
Industrial Units Construction Work- Establishment Of A Biomass Firing And Biogas Preparation System At The Weißenfels Composting Plant 5: Biogas Treatment Plant Bgaa. Lot 5: Biogas Preparation System Bgaa --------------------------------------- ------------ The Biogas Generated In The Fermenter Is To Be Prepared In The Biogas Preparation System (Bgaa) Using Chemical Laundry Into A Feed-In Biomethan Can. Capacity Of The Bgaa: All Components Must Be Interpreted In Such A Way That The System Can Permanently Process At Least 500 Nm³/H. Understanding (Tolerance) Of Individual Units Must Be Observed And 10 % Capacity Reserve For The Entire Bgaa (Maximum Capacity 550 Nm3/H). The Bgaa Will Essentially Include: - Pre -Cooling And Increasing The Pressure Of The Raw Biogas - Option: Pre -Cooling Using Gas Washers - Demolization Using Redundant Activated Carbon Filters - Optional: Voc Removal Using Activated Coal Filter - Aminwashing For Co2 Deposition Including Regeneration Of The Amins - Gas Analyzes - Biometh Cooling - Biothan Adsorption Drying - Printer Increase Blower For Biomethane - Pipelines And Fittings From The Entrance Flange Bgaa Raw Biogas To The Output Flange Bgaa (Internal Piping Between The Transfer Points) - Pipeline Parts For Raw Biogas Supply And Bad Gas Recovery And Its Integration In The Stock Of The Delivery And Power Scope Of The An Commissioning Of The Gas Preparation System. This Includes All System Areas And All Services That Are Necessary For The Turnkey Construction Of The Gas Preparation System And Its Connection To The Existing Biogas Plant, Even If You Should Not Be Mentioned Below. The Services That Are Expressly Named In This List Of Services Are Excluded. The Deliveries And Services Include In Particular, But Not Exclusively:- Execution Planning Of The Gas Treatment Including Installation, Interface, Foundation And Stress Plan- Relevant Support Of The Ag And The Provision Of Required Documents When Applying For Change Permits, Provided That These Are Permitted (E.G. . The Start-Up And Civil Engineering Work For The Production Of The Necessary Foundations Takes Place On The Basis Of The Requirements Of The An. If It Prefers To Specify And Justify This To The Construction Of A Floor Slab, The Current Planning Provides For Point And Strip Foundations In An Asphalt Area. The Auditing Statics Of The Bgaa (Container And Outer Trade) Including Load Distribution Plans And The Interpretation Of The Foundations (Scarf And Reinforcement P
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f074125c-baed-4bda-85e9-973b70ef84a1.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.