GTR 92015318

Tenders Are Invited For Project And Design Preparation, Estimation Of Costs-Development Of Project And Technical Documentation For The Establishment Of A Common Automation System And Management Of Technical Systems Of Buildings That Will Increase Energy Efficiency As Part Of The Dr. J. Benčević Slavonski Brod

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
92015318
Tendering Authority
Subscribe to view
Tender No
64709-2025
Financer Name
European Union (EU)
Work Title
Tenders Are Invited For Project And Design Preparation, Estimation Of Costs-Development Of Project And Technical Documentation For The Establishment Of A Common Automation System And Management Of Technical Systems Of Buildings That Will Increase Energy Efficiency As Part Of The Dr. J. Benčević Slavonski Brod
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union
Last Date of Bid Submission
05-03-2025 Closed
Work Detail
Project And Design Preparation, Estimation Of Costs-Development Of Project And Technical Documentation For The Establishment Of A Common Automation System And Management Of Technical Systems Of Buildings That Will Increase Energy Efficiency As Part Of The Dr. J. Benčević Slavonski Brod. The Subject Of Procurement Is The Development Of Project And Technical Documentation For The Establishment Of A Common Automation System And Management Of The Technical System Of Buildings That Will Increase Energy Efficiency Of Buildings, Surgery, Old Polyclinic, Infectology And Psychiatry, That Is, Green Transition, In Accordance With The Technical Specifications, Stated In The Document - 1- 39_25 Technical Specifications ”, The Cost Of The Procurement. The Technical Documentation That Is Planned To Be Made Is: 1. Creating A Recording Of The Existing Situation On Each Of The Four Buildings To Establish A Common Automation System And Management Of The Technical Systems Of Buildings-4 Of The States (The Services Of The Preparation Of The Study And Equivalent Documents Required For The Conceptual Project And The Main Project Project). Records Of The Existing Situation Will Contain: The Technical Description Of The Building, Photodococumentation, Graphic Attachments (Drafts, Floor Plans, Sections, Etc.) For Each Floor All Four Buildings. 2. Development Of Project And Technical Documentation (Main And Performing Projects) To Establish A Common Automation System And Management Of The Technical System Of Buildings That Will Increase The Energy Efficiency Of Buildings (Old Polyclinic, Surgery, Infectology, Psychiatry) In Which It Is Necessary To Develop 2.1. Creating A Conceptual Architectural And Conceptual Solution On Each Of The Four Buildings-4 Solutions. The Conceptual Architectural And Conceptual Solution Contains A Formative, Functional, Economical And Graphic Checks Of The Concept That Will Be The Basis For The Creation Of The Main Project, And It Is Necessary For The Client To Be Delivered And Presented The Planned Solution To The Insight And Approval For The Further Continuation Of The Project Documentation. 2.2. Creating A Major Project On Each Of The Four Buildings - 4 Projects The Main Project Should Be Made As A Set Of Compliant Projects To Give A Technical Solution And Proves The Fulfillment Of The Basic Requirements For The Building And Other Prescribed And Certain Requirements And Conditions. Each Individual Main Project Of The Building Will Include An Architectural Project, A Water Supply And Sewage Project, An Electrical Engineering And A Project Of Mechanical Installations (With Associated Costs) And The Study Of Occupational Safety. Mechanical Engineering Project Refers To Heating, Ventilation, Air Conditioning And Installation Of Medical Gases. The Cost Of Works And Equipment With And Without Prices Will Be Made On The Basis Of The Main Project For The Purpose Of Planning The Necessary Funds For Investment. Costs Must Be Made In Accordance With The Rules Of Public Procurement. 2.3. Creating A Performance Project On Each Of The Four Buildings - 4 Projects Designing Projects Should Contain Projects Of Individual Professions That Develop A Technical Solution In Detail From The Main Project And Fulfill The Conditions From The Main Project (Performing Drafts Of All Installations, Etc.). 2.4. Creating A Major Supervisory Room Project For The Common Automation And Management System - 1 Project 2.5. Development Of The Performance Project Of The Supervisory Room For
Key Value
Tender Value
256,317 - HRK
Tender Documents
Global Tender Document
69800e9d-92e2-4698-8177-4651d7d60dc6.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders