GTR 91162433

Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Specialist Planning Services For Technical Equipment In Accordance With Section 53 Paragraph 2 Hoai - Investment Group 4 (Power Systems)

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
91162433
Tendering Authority
Subscribe to view
Tender No
24075-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Architectural, Construction, Engineering And Inspection Services – Specialist Planning Services For Technical Equipment In Accordance With Section 53 Paragraph 2 Hoai - Investment Group 4 (Power Systems)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
16-02-2025 Closed
Work Detail
Architectural, Construction, Engineering And Inspection Services – Specialist Planning Services For Technical Equipment In Accordance With Section 53 Paragraph 2 Hoai - Investment Group 4 (Power Systems). Basic Information For Dimensioning The Emergency Power System: The Achievable Maximum Load Of The Uninterruptible Power Supply System (Ups System) Of 375 Kw Should Be Used As The Basis For Calculating The Load To Be Secured In The Future. A Further 400 Kw Must Be Taken Into Account For Redundantly Operated Recooling Systems. Bafin Is Also Planning To System Integrate An Additional Data Center Based On A Mobile, Self-Sufficient Solution. The System Integration Of This Additional Data Center Should Already Be Taken Into Account In The Design Of The Service Advertised Here. The Requirement Is Currently Assessed At 195 Kw (Modular Data Center Plus Redundant Recooling Systems). Documents, Information And Data Will Be Made Available By The Client At The Appropriate Time. The Nea Should Be Designed In Such A Way That, In Addition To The Existing Components And The Target Cooling Capacity, It Can Operate Up To 200 New Office Workstations As Well As The Associated It Network Distribution Rooms Including Air Conditioning Split Systems (An Additional Approx. 150 Kw). Technical Information And Target Values ​​Are Provided In Chapter Iv.1.1. Specified In The Service Description. In Addition, An Additional Requirement Of At Least 30% Should Be Taken Into Account For Trouble-Free Operation In Order To Anticipate An Increase In The It Load Over 15 Years (Modular Expansion). Finally, It Should Be Noted That In Recent Years, Due To Rising Outside Temperatures, The Cooling System Has Mostly Been Operated At Full Load. Corresponding Additional Requirements Must Be Taken Into Account When Dimensioning The Nea.
Key Value
Tender Value
592,100 - EUR
Tender Documents
Global Tender Document
9e16f6a4-afc5-42e0-91d6-1038b265fcce.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders