GTR 91114786
Tenders Are Invited For Construction Work - Design And Execution Of Construction Works On The Gdynia Chylonia - Lębork Section Of Railway Line No. 202 As Part Of The Project Entitled: Works On Railway Line No. 202 On The Gdynia Chylonia - Słupsk Section - Phase Ii.
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
91114786
Tendering Authority
Subscribe to view
Tender No
19112-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Design And Execution Of Construction Works On The Gdynia Chylonia - Lębork Section Of Railway Line No. 202 As Part Of The Project Entitled: Works On Railway Line No. 202 On The Gdynia Chylonia - Słupsk Section - Phase Ii.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
31-01-2025
Closed
Work Detail
Construction Work - Design And Execution Of Construction Works On The Gdynia Chylonia - Lębork Section Of Railway Line No. 202 As Part Of The Project Entitled: Works On Railway Line No. 202 On The Gdynia Chylonia - Słupsk Section - Phase Ii.. The Subject Of The Order Is: Design And Execution Of Construction Works On The Gdynia Chylonia - Lębork Section Of Railway Line No. 202 As Part Of The Project Entitled: Works On Railway Line No. 202 On The Gdynia Chylonia - Słupsk Section - Phase Ii. The Entire Subject Of The Order Includes The Execution Of The Following Elements: The Basic Scope Of The Order Includes: 1. Development Of Design Documentation, Including: A) Construction Design, B) Detailed Designs With Bills Of Quantities And Stwiorb, C) Obtaining Water Permits, D) Obtaining Decisions On Environmental Conditions Impact On The Environment, E) Obtaining A Decision On Determining The Location Of A Railway Line And/Or A Decision On Determining The Location Of A Public Purpose Investment, F) Obtaining A Building Permit And Other Necessary Administrative Decisions, G) Carrying Out The Necessary Appraisals To Pay Compensation For The Purchased Real Estate (Land, Buildings), H) Developing As-Built Documentation, Including As-Built Geodetic Documentation, 2. Construction Works In The Scope Of: A) Extension Of The Line Along The Entire Section To A Double-Track System, B ) Reconstruction Of Tracks To Adapt The Geometry To Accommodate Passenger Trains At Speeds Of Up To 200 Km/H And Freight Trains At Speeds Of Up To 120 Km/H Km/H, C) Installation Of New Railway Traffic Control Devices (Srk), D) Telecommunications Devices And Systems, E) Traction Network With Power Supply, F) Electrical Power Devices And Systems Up To 1 Kv, G) Construction And Reconstruction Of Engineering Facilities, H ) Platforms And Structures, I) Construction Of New Passenger Stops, J) Crossings And Crossings, K) Liquidation Of Railway Line-Road Intersections At Rail Level, L) Geology And Geotechnics 3. Carrying Out Works Involving The Construction Of Environmental Protection Facilities. 4. As-Built Documentation, Including: A) Development Of Technical Regulations, In Cooperation With The Ordering Party, Based On Instruction Ir-3, After The Completion Of Construction Works, In All Industries, B) Development Of As-Built Surveying Documentation: - Chainage Of The Line And The Longitudinal Profile Of The Line Railway, - Handover And Acceptance Protocols For Track Axis Adjustment Signs, - Numerical Situational And Height Map With Geodetic As-Built Inventory, C) Carrying Out The Process Of Assessing The Conformity Of Subsystems And Submitting Appropriate Ec Declarations And Certificates For The Subsystems, D) Developing Documentation Of The Establishment And Measurement Of The Railway Basic Geodetic Network And The Railway Special Network, E) Developing New Diagrams Of Traffic Control Stations And Expedition Points. 5. Conducting The Conformity Assessment Process Of Structural Subsystems Within The Scope Of The Order At Each Stage (Design, Construction And Final Tests Of The Subsystem) And Submitting The Appropriate Ec Verification Declarations And Ec Verification Certificates For The Subsystems. The Interface Option Includes: Implementation Of The Services Specified In Chapter 5 Of Volume Iii - Pfu Expected Changes In The Scope Of
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
6fbe8d6d-b3fb-4d8a-8a5e-dd1076895e9f.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.