GTR 90955312
Tenders Are Invited For Landfill-Gas Electricity Generating Plant Construction Work – Construction Of A Cogeneration System Based On Gas Engines With A Capacity Of Approx. 30 Mwe/30 Mwt At Tauron Ciepło Sp. Z O. O. Bielsko-Biała Generation Plant, Bielsko-Północ Heat And Power Plant Ec2
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
90955312
Tendering Authority
Subscribe to view
Tender No
14329-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Landfill-Gas Electricity Generating Plant Construction Work – Construction Of A Cogeneration System Based On Gas Engines With A Capacity Of Approx. 30 Mwe/30 Mwt At Tauron Ciepło Sp. Z O. O. Bielsko-Biała Generation Plant, Bielsko-Północ Heat And Power Plant Ec2
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
29-01-2025
Closed
Work Detail
Landfill-Gas Electricity Generating Plant Construction Work – Construction Of A Cogeneration System Based On Gas Engines With A Capacity Of Approx. 30 Mwe/30 Mwt At Tauron Ciepło Sp. Z O. O. Bielsko-Biała Generation Plant, Bielsko-Północ Heat And Power Plant Ec2. The Subject Of The Order Is The Implementation Of The Task Titled: Construction Of A Cogeneration System Based On Gas Engines With A Capacity Of Approx. 30 Mwe/30 Mwt At Tauron Ciepło Sp. Z O. O. Bielsko-Biała Generation Plant, Bielsko-Północ Ec2 Heat And Power Plant. The Subject Of The Order Includes The Design And Construction For The Ordering Party On A Turnkey Basis Of A Facility Constituting A Cogeneration Installation Consisting Of A System Of 3 (Three) Cogeneration Units Based On Gas Piston Engines Together With Auxiliary Installations And A Heat Accumulator As Well As All Construction Facilities Required By The Technology, Allowing Its Commercial Operation For A Period Of At Least 25 (Twenty-Five) Years From The Handover Of The Facility To Operation, Enabling The Consumption Of The Necessary Utilities (Including Gaseous Fuel), Their Processing And The Generation Of Electricity And Feeding It Into The Power Grid, As Well As The Production Of Heat And Feeding It Into Heating Systems, And Meeting All The Requirements For The Ordering Party To Obtain A Cogeneration Bonus For A Period Of 15 (Fifteen) ) Years In Accordance With The Cogeneration Act. The Turnkey Formula Means The Method Of Constructing The Facility According To The Principle Of Comprehensive Design, Delivery, Construction, Including Assembly, Commissioning And Commissioning As An Integrated Whole With Technological Features And Parameters, Including Guaranteed Technical Parameters, With The Execution Of All Works, That Are Necessary For The Facility To Achieve The Performance, Operational Characteristics, Safety And Performance Required In The Agreement, Even If Any Elements Of The Facility Are Not Expressly Specified In The Agreement Or Attached To It. The Turnkey Formula Obliges The Contractor To Completely Connect The Facility With The Existing Zwb Ec2 Infrastructure At The Connection Points Within The Dates Specified In The Implementation Schedule. Connection Understood In This Way Is Within The Scope Of The Subject Matter Of The Agreement. The Detailed Description Of The Subject Of The Order (Opz) Was Specified In The Annexes To The Draft Provisions Of The Agreement (Appendix No. 3 To The Swz, Including, Among Others, The Functional And Utility Program With Annexes And Guaranteed Technical Parameters).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
39913e89-4e67-4c00-859d-34f151f45f95.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.