GTR 90658208
Tenders Are Invited For Feasibility Study – Geru-Technical-Economic Documentation Development Services, Mixed Investment Project Phase, For The Investment Objective Proposed Works Related To The Hydrographic Space Delimited By The Tributaries Of The Siret River, Development Of The Geru River And Its Tributaries, Galați County,
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
90658208
Tendering Authority
Subscribe to view
Tender No
800978-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Feasibility Study – Geru-Technical-Economic Documentation Development Services, Mixed Investment Project Phase, For The Investment Objective Proposed Works Related To The Hydrographic Space Delimited By The Tributaries Of The Siret River, Development Of The Geru River And Its Tributaries, Galați County,
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union
Last Date of Bid Submission
20-01-2025
Closed
Work Detail
Feasibility Study – Geru-Technical-Economic Documentation Development Services, Mixed Investment Project Phase, For The Investment Objective Proposed Works Related To The Hydrographic Space Delimited By The Tributaries Of The Siret River, Development Of The Geru River And Its Tributaries, Galați County,. The Purpose Of The Application Of This Procedure Is The Award Of The Service Contract For The Development Of Technical And Economic Documentation (Mixed Investment Project Phase) For The Investment Objective Proposed Works Related To The Hydrographic Space Delimited By The Tributaries Of The Siret River, Development Of The Geru River And Its Tributaries, Galați County. The Need And Opportunity To Promote Investment Works Is Supported (Justified) Both By The Extent Of The Damage Caused By The Flood On The Suhu River And Its Tributaries, And By The High Degree Of Risk Highlighted By The Flood Risk Maps For Different Probabilities Of Exceeding The Flows. Taking Into Account The Specificity Of The Problems Reported In The Basin, The Designer Will Analyze Through Hydraulic Modeling The Effect Of The Measures Envisaged On The Floodability Of The Studied Areas And Has Full Freedom To Propose Structural And Non-Structural Measures (Transversal/Longitudinal Accumulations, Bed Recalibrations, Construction Of Dykes, Relocation Of Dykes, Embankments, Retaining Walls, Etc.) With The Role Of Reducing The Damage Caused By Floods And Removing Under The Influence Of The Effects Of The Floods Of The Localities. Depending On The Hydraulic Modeling And Field Studies, A Technical Expertise Of The Existing Reservoir And The Hydrotechnical Works Under The Administration Of A.B.A. Is Required. And If The Technical Solutions Require It, Their Relocation Or Decommissioning Will Be Analyzed. The Designer Will Analyze, But Not Be Limited To, The Appropriateness And Effectiveness Of The Measures Identified And Mentioned In The Flood Risk Management Plan - A.B.A. Prut–Bârlad Approved In 2023. The Following Work Proposals Will Be Considered, Which Have The Main Role Of Reducing The Damage Caused By Floods And Removing The Towns From The Effects Of Floods: I. Development Of The Geru River And Its Tributaries, County. Galaţi: - Riverbed Arrangement In A Length Of L = 57.0 Km - 3 Non-Permanent Accumulations, As Follows: I.1. Development Of Geru River, Siret Confluence - Place. Mândreşti: - Development Of The Geru River Bed, L = 42 Km; - Realization Of A Non-Permanent Accumulation Upstream Valea Mărului I.2. Development Of The River Jepea (Cudalbi): - Development Of The Bed Of The River Jepea (Cudalbi), L = 5 Km; - Realization Of A Non-Permanent Accumulation Upstream Cudalbi Locality I.3. Development Of The Gologanu River: - Development Of The Gologanu River Bed, L = 10 Km; - The Creation Of A Non-Permanent Accumulation In The Right Of Mănăstiri Gologanu Estimated Flood Defense Works Are: Three Non-Permanent Accumulations (Upstream Valea Mărului Locality, Upstream Cudalbi Locality, In The Right Of Mănăstiri Gologanu) Streambed Regularization, Protective Dykes Against Floods If Necessary, Works Regarding The Control Sediments, Etc., According To Stas 4273/1983 And Stas 4068/2/1987 Respectively Class Iii Of Importance, Having The Calculation Flow Under Normal Execution Conditions = The Flow With The Annual Probability Of Exceeding 2% And The Verification Flows: - With The Probability Of 0.5% For B
Key Value
Tender Value
6,239,495 - RON
Tender Documents
Global Tender Document
18c594a9-4043-4328-8428-3a03fea25058.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.