GTR 90281942
Tenders Are Invited For Scaffolding Work - Scaffolding Work - Iga 2027, Coal Bunker Ensemble - Building Part B: Band Bridge (Kbe-B), Grothusstraße 205, 45883 Gelsenkirchen
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
90281942
Tendering Authority
Subscribe to view
Tender No
786466-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Scaffolding Work - Scaffolding Work - Iga 2027, Coal Bunker Ensemble - Building Part B: Band Bridge (Kbe-B), Grothusstraße 205, 45883 Gelsenkirchen
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
28-01-2025
Closed
Work Detail
Scaffolding Work - Scaffolding Work - Iga 2027, Coal Bunker Ensemble - Building Part B: Band Bridge (Kbe-B), Grothusstraße 205, 45883 Gelsenkirchen. - Static Verifications And Calculations Of The Scaffolding Constructions - Workshop And Assembly Planning Including Assembly Concept For The Scaffolding Constructions - 23,816 M3 Of Standing Scaffolding As Work And Protective Scaffolding According To Din 4420-1 For Inclined Band Bridges, Load Class 4, Height Class 1, Set Up, Kept In Stock For 56 Weeks And Dismantled - Install 1,653 M Of Additional Side Protection For Scaffolding Layers, Keep It Available For 56 Weeks And Dismantle It - 1,484 M Of Deck Widening, Bracket Width 0.33-0.66 M, Assemble, Hold For 56 Weeks And Dismantle - 1 Piece Of Bridging Structure Made Of Trusses In Scaffolding, Span Approx. 4.50 M, Assemble, Hold For 56 Weeks And Dismantle - 2 Pieces Of Bridging Structures From Trusses In Scaffolding, Span Approx. 6.00 M, Assemble, 56 Weeks Keep In Reserve And Dismantle - 1 Piece Of Bridging Structure Made Of Trussed Girders In Scaffolding, Span Approx. 12.00 M, Assemble, Keep In Reserve For 56 Weeks And Dismantle - 1 Piece Of Bridging Structure Made Of Trussed Girders In Scaffolding, Span Approx. 24.00 M, Assemble, Keep In Reserve For 56 Weeks And Dismantle - 1 Piece Of Bridging Structure Made Of Trusses In Scaffolding, Span Approx. 30.00 M, Assemble, Hold For 56 Weeks And Dismantle - 1,189 M2 Of Weather Protection Roofs In A Scaffolding Construction, Span Approx. 6.40 M, Snow Load 0.75 Kn/M2, Assemble, Hold For 56 Weeks And Dismantle - 1,112 M2 Of Water Collecting Trays In A Scaffolding Construction, Width Approx. 6 .40 M, Assemble, Hold For 56 Weeks And Dismantle - 4,860 M2 Of Vertical Scaffolding Protection Tarpaulins, Kept For 56 Weeks And Dismantled - 1,131 M2 Of Horizontal Scaffolding Protection Tarpaulins, Kept For 56 Weeks And Dismantled - Attach 5 Pieces Of Dust Protection As Locks With Wicket Doors To Scaffolding, Kept For 56 Weeks And Dismantled - 4 Pieces Of Double-Flight Staircases For Scaffolding, Height 12 - 28 M, Build Up, Hold For 56 Weeks And Dismantle - 3 Construction Elevators For Transporting People And Materials On Scaffolding, Height 13 - 30 M, Load Capacity 1,500 Kg, Set Up, Keep For 56 Weeks And Dismantle - 1 Set-Down Platform, Length / Width 5.00 X 3.00 M, Height 6, 00 M, Load Capacity 200 Kg/M2, Set Up, Kept For 56 Weeks And Dismantled
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
956c38cb-46b2-40b2-9ece-ffe11753471e.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.