GTR 90238615
Quotation Are Invited For Emergency Blow Down And Vacuum System Valves Overhauling Work
ICB — International Competitive Bid
Closed
Asia
Tender Information
GTR Reference
90238615
Tendering Authority
Subscribe to view
Tender No
2332403227
Financer Name
Self-Funded
Work Title
Quotation Are Invited For Emergency Blow Down And Vacuum System Valves Overhauling Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Asia
Political Region
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
Last Date of Bid Submission
23-12-2024
Closed
Work Detail
Quotation are invited for Emergency Blow down and Vacuum System Valves Overhauling Work 1032405793 1 ITEM-00001 OVERHAULING OF EMERGENCY BLOW DOWN DN 600 ORTON BUTTERFLY SPARE VALVE ATK STATION PHASE 1 DESAL.QUANTITY: 1 VALVESCOPE OF WORK UNDER THIS PR IS TO OVERHAUL THE VALVE WITH REPLACEMENT OFDAMAGED PARTS INCLUDING FASTENERS, GASKETS, TRANSPORTATION IF ANY,MATERIAL HAND LING, ASSEMBLY OF VALVE, TESTING AND INSTALLATION.COMPLETE WORKS ASSOCIATED WITH THE JOB IS IN CONTRACTORS SCOPE.JOB COMPLETION SHA LL BE ONLY AFTER SUCCESSFUL TESTING OF VALVE.DISMANTLING:(1) DISMANTLING THE COMPLETE VALVE AND GEARBOX.(2) BLASTING AND CHEMICALLY CLEAN THE COMPLETE UNIT AND PREPARE OFINSPECTION(3) INSPECTION OF VALVE INDIVIDUAL PARTS AFTER THE REMOVAL OF DISC/BEARING/ SHAFT / GEARS.WELD REPAIR OF BODY SEAT BORE AND DISC:1. PRE- MACHINE THE BODY SEAT BORE AND DISC2. ON SUCCESSFUL PRE- MACHINING CARRY 1 EA OUT TH E NDT CHECK AND MAKE SURESURFACE IS FREE FROM CRACKS AND OTHER DEFECTS3. SUBMIT THE WPS AND PQR WITH WELDER QUALIFICATION FOR DEW A APPROVAL4. WELD THE BODY AND WEDGE AS PER ASTM B1 48 C95500 MATERIALREQUIREMENTS5. CARRY OUT THE FINAL MACHINING ON THE BODY AND D ISC AS PER THE DINSTANDARD AND MANUFACTURE RECOMMENDATION6. ON SUCCESSFUL COMPLETION OF FINAL MACHINING CARRY OUT THE NDT CHECKAND M AKE SURE SURFACE IS FREE FROM ANY DEFECTSFINAL ASSEMBLY AND TESTING:1. ASSEMBLY THE UNIT AS PER THE ASSEMBLY PROCEDURE2. CARRY OUT T HE TESTING OF THE VALVE # AS PER API 5983. ON SUCCESSFUL COMPLETION OF TESTING PREPARE THE VALVE FOR PAINTINGDEWA SCOPE:SEAL RING ON LY IF NECESSARY.COMPLETION TIME: 30 DAYS, WARRANTY - 1 YEAR AFTER INSTALLATION FOR MORE DETAILS:JAMES KUMAR0529126512 / 0508816578JAM [email protected] SPECIAL NOTES / INSTRUCTIONS: Emergency blow down and vacuum system valves overhauling work; K Station Phase 1 Desal STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332403227)/$value
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8d76b982-83b9-423d-a5f1-90573730ebd8.pdf
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.