GTR 90127851

Tenders Are Invited For Ancillary Works For Pipelines And Cables – New Construction Of The 110 Kv Cable Connection Between Uw Sprendlingen And Uw Neu-Isenburg

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
90127851
Tendering Authority
Subscribe to view
Tender No
771187-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Ancillary Works For Pipelines And Cables – New Construction Of The 110 Kv Cable Connection Between Uw Sprendlingen And Uw Neu-Isenburg
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
31-01-2025 Closed
Work Detail
Ancillary Works For Pipelines And Cables – New Construction Of The 110 Kv Cable Connection Between Uw Sprendlingen And Uw Neu-Isenburg. The Gesellschaft Für Hochvoltsbau Offenbach Mbh, Gho (Also Called Ag) Intends To Build A 110 Kv Cable Connection Between The Sprendlingen Substation On Philipp-Reis-Str. On Behalf Of Energienetze Offenbach Gmbh. 8 In 63303 Dreieich And The Newly Built Data Center In Neu-Isenburg In Rathenaustr. 29-31 In 63263 Neu-Isenburg. The Route Has A Total Length Of Approx. 2,400 M. It Runs From The Dreieich-Sprendlingen Substation Under The L3317 Through The Forest To Rathenaustr. In Neu Isenburg. This Tender Includes The Construction Of The Empty Pipe Route. The Laying Of The 110 Kv Cables And The Corresponding Assembly Work Are Not Part Of This Tender. The Total Route Length Of Approx. 2,400 M Is Divided As Follows: - Open Construction Approx. 250 M - 5 Drilling Sections Each With Two Parallel Boreholes (10 Flushing Boreholes) With A Total Length Of Approx. 2,050 M - The Remaining Approx. 100 M Are To Be Provided By The Customer Brought Forward On Your Own Property. Flushing Drilling Will Be Carried Out In The Following Areas: - From The Sprendlingen Subway, Crossing Under The L3317 To The Entrance To The Forest - In The Forest Path In The Direction Of Frankfurter Str. To The First Socket Location - In The Forest Path In The Direction Of Frankfurter Str. - Crossing Under Frankfurter Str. And In The Forest Area To To The Second Socket Location - Crossing Under The Forest Area To The Forest Path In The Direction Of Rathenaustr. A 110 Kv Cable System Includes 3 Empty Conduits, Type Hd-Pe-225, And A Protective Pipe For The Earth Cable, Type Dn 63. In Total, 2 Cable Systems Are Laid. In Addition, An Empty Pipe For Communication Is Laid, Type Dn 63. In Open Civil Engineering, The Cables Are Protected Using Cable Warning Tape And Concrete Slabs. The Flush Drilling Work Can Be Carried Out Parallel To The Construction Work Using The Open Construction Method. The Execution Plans For The Respective Flushing Drillings Must Be Drawn Up By The Contractor On The Basis Of And Taking Into Account The Clients Planning; The Representation Of The Drilling Process Should Be Shown In A Profile Plan. The Execution Planning For The Open Construction Method Will Be Made Available To The Contractor By The Client.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
400e7f96-68d5-40fd-aecb-b7624d789242.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders