GTR 89090888

Tenders Are Invited For Consultative Engineering And Construction Services - Scientific And Technical Consulting Regarding The Implementation Of The T-2 Road Tunnel And Protection Of Landslides As Part Of The Task: Design And Construction Of The S19 Expressway On The Jawornik - Lutcza Section, Approx. 5.25 Km Long

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
89090888
Tendering Authority
Subscribe to view
Tender No
718951-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Consultative Engineering And Construction Services - Scientific And Technical Consulting Regarding The Implementation Of The T-2 Road Tunnel And Protection Of Landslides As Part Of The Task: Design And Construction Of The S19 Expressway On The Jawornik - Lutcza Section, Approx. 5.25 Km Long
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
02-01-2025 Closed
Work Detail
Consultative Engineering And Construction Services - Scientific And Technical Consulting Regarding The Implementation Of The T-2 Road Tunnel And Protection Of Landslides As Part Of The Task: Design And Construction Of The S19 Expressway On The Jawornik - Lutcza Section, Approx. 5.25 Km Long. The Subject Of The Order Is Scientific And Technical Consultancy Regarding The Construction Of The T-2 Road Tunnel And Protection Of Landslides As Part Of The Task: Design And Construction Of The S19 Expressway On The Jawornik - Lutcza Section, Approx. 5.25 Km Long. The Service Includes Scientific And Technical Consulting, Also Known As Scientific Supervision, During The Design And Implementation Of Works Related To The T-2 Tunnel And Landslide Protection On The S19 Jawornik - Lutcza Section, Approximately 5.25 Km Long, In Particular: 1. Verification Of The Design Solutions Developed By The Contractor In Scope Of The Construction Design In Terms Of Their Validity And Admissibility, Taking Into Account Legal And Contractual Formal Requirements And The Best Currently Available Technical Knowledge (Completed Issuance Of The Scientific Supervision Position). 2. Verification Of The Design Solutions Developed By The Contractor In The Field Of Executive/Technological/Technical Designs In Terms Of Their Validity And Admissibility, Taking Into Account Legal And Contractual Formal Requirements And The Best Currently Available Technical Knowledge, Including, Among Others: An Addition To The Geological And Engineering Documentation [Including The Probability Of Gas Occurrence In The Massif (Type Of Gas, Gas Pressure, Contact Zones)] And Hydrogeological Documentation, Mining Plant Operation Plan And Rescue Action Plan (Concluded With The Issuance Of The Scientific Supervision Position). 3. Opinion Of Scientific Supervision In The Form Of Technological, Construction And Technological Assessment Of Issues Arising At The Stage Of Drilling The T-2 Road Tunnel, Transverse Passages And Securing Tunnel Portals Or Landslides, Verification Of The Technologies And Materials Used, Authors Supervision Cards. 4. Verification Of The Assumptions For Calculations And Calculations Performed By The Contractor In The Scope Of Projects For Securing Landslides And Landslide-Prone Areas At The Construction Design Stage, Along With Verification Of The Monitoring Project (Surface And In-Depth) Of Landslides And Landslide-Prone Areas (Concluded With The Issuance Of The Scientific Supervision Position). 5. Verification Of Assumptions For Calculations And Calculations Performed By The Contractor Of Works In The Field Of Landslide Protection Projects And Landslide-Prone Areas At The Stage Of The Detailed Design (Completed With The Issuance Of The Scientific Supervision Position). 6. Verification Of The Design Solutions Developed By The Contractor At The Construction Design Stage Regarding The Tunnel Equipment And Its Infrastructure And The Tunnel Safety Documentation, In Terms Of, Among Others, Correctness, Security, Reasonableness And Admissibility, Among Others. Assumptions, Calculations, Analyses, Simulations And Technologies, Taking Into Account Legal And Contractual Formal Requirements, Swz And The Best Currently Available Technical Knowledge (Culminating In The Issuance Of A Clear Scientific Supervision Position); 7. Verification Of The Design Solutions Developed By The Contractor At The Stage Of The Detailed Design (Pw) Regarding The Tunnel Equipment And Its Infrastructure
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
fda83750-7f74-40d0-a909-d31e5dd748c8.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders