Common Market for Eastern and Southern Africa, COMESA,African Union
20-01-2025
Work Detail
Quotation are invited for Remodeling of the LHDA Tower Building Ground Floor. SCOPE OF WORK The LHDA Tower Building ground floor is a U-shaped space having a total floor area of approximately 490m2. The space has pillars which support the building and has ablutions facilities which need to be remodelled and upgraded. The space should house a multi-functional hall and a storage room should be provided for, where equipment e.g. tables, chairs etc., which when not in use can be stored. The Interior Designer and members of the team shall visit the LHDA Tower Building to familiarise themselves with the ground floor, the corporate image and culture of the LHDA. They will also be required to take measurements of the space as there are no blueprints of the building. The interior design of the ground floor should include aspects such as layout, lighting, audio visual equipment, plumbing fixtures and fittings, floor covering, ceilings, joinery, fixtures, fittings, and wall finishes. The designs should however adhere to statutory building requirements and health and safety requirements. The site visit is mandatory and is scheduled for the 18 November 2024 at 10:30 at the LHDA Tower Building, in Maseru. Tender Link : https://lhda.org.ls/procurement/currentTenders
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.