GTR 88830944
Tenders Are Invited For Comprehensive Supply Of High-Methane Natural Gas Type E From The Lng Regasification Station For The Public School Complex In Borowo
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
88830944
Tendering Authority
Subscribe to view
Tender No
ZSP.260.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Comprehensive Supply Of High-Methane Natural Gas Type E From The Lng Regasification Station For The Public School Complex In Borowo
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
03-12-2024
Closed
Work Detail
2. Description Of The Subject Of The Order.1. The Subject Of The Order Is The Conclusion Of A Contract For The Comprehensive Supply And Transmission Services Of High-Methane Natural Gas Type E From The Lng Regasification Station For The Public School Complex In Borów. 2. Detailed Description Of The Subject Of The Order: A) Place Of Delivery And Collection Of Gas Fuel: Public School Complex In Borowo, Ul. Wrocławska 24, 57-160 Borów.B) The Fuel Will Be Used At One Consumption Point To Heat The Rooms Used In The Building Of The Public School Complex In Borów And Prepare Domestic Hot Water, The Generated Heat Will Be Used Only For The Needs Of The School.C) The Fuel Will Be Supplied From The Station Lng Regasification Located On Plot No. 102/5, Brzezica District, Commune. Borów. Filling The Station And Delivering Fuel On The Terms And Conditions Of The System Operator. D) Gas Receiver Type: Two Gas Central Heating/Hot Water Boilers. With A Power Of 240 Kw Each, Gas Stools With A Total Power Of 28 Kw (2 X 14 Kw), Gas Stove With A Power Of 37 Kw. E) Type Of Gas Fuel: High-Methane Natural Gas According To The Standard: Pn-C 04750, Symbol E. F) Forecasted Gas Consumption During The Term Of The Contract Is 665,025 Kwh (59,000 M3). For The Purposes Of Preparing The Offer, The Estimated Demand Is Set At 665,025 Kwh.G) Estimated Demand For Gas Fuel Determined On The Basis Of Planned Gas Consumption. H) The Estimated Demand Is Used Only For Comparison Of Offers And In No Case Does It Constitute An Obligation On The Part Of The Ordering Party To Purchase Gas In The Given Quantity. The Contractor Will Not Be Entitled To Any Claim For Failure To Collect The Expected Amount Of Gas Fuel By The Ordering Party During The Term Of The Contract. Any Change In The Estimated Consumption Will Not Result In Additional Costs For The Ordering Party, Apart From The Settlement For The Actual Amount Of Gas Consumed. I) Tariff Group W-5, Ordered Power (Contracted Power) 614Kwh/H, (56M3/H) Excise Duty Pursuant To Art. 31B Section 2 Point 4 Of The Excise Duty Act (Consolidated Text: Journal Of Laws Of 2014, Item 752).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
503fd814-11a6-4dd0-aa86-1436e02683af.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.