GTR 88745776

Tenders Are Invited For Construction Work - Designing And Implementation Of Construction And Exercise Of Authors Supervision During Construction Under The Project Sustainable Energy Renovation Of The Housing Stock Of The Owners Association Shtastlivetsa - City Svishtov, St. Cyril D. Avramov No. 10 According To Npvu

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
88745776
Tendering Authority
Subscribe to view
Tender No
703505-2024
Financer Name
European Union (EU)
Work Title
Tenders Are Invited For Construction Work - Designing And Implementation Of Construction And Exercise Of Authors Supervision During Construction Under The Project Sustainable Energy Renovation Of The Housing Stock Of The Owners Association Shtastlivetsa - City Svishtov, St. Cyril D. Avramov No. 10 According To Npvu
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
03-01-2025 Closed
Work Detail
Construction Work - Designing And Implementation Of Construction And Exercise Of Authors Supervision During Construction Under The Project Sustainable Energy Renovation Of The Housing Stock Of The Owners Association Shtastlivetsa - City Svishtov, St. Cyril D. Avramov No. 10 According To Npvu. The Subject Of The Public Procurement Includes The Following Activities: Development Of An Investment Project In The Working Project Phase For The Implementation Of The Most Effective Package Of Energy-Saving Measures For The Building, Which Achieves A Minimum Energy Consumption Class B In Compliance With The Package Of Energy-Saving Measures ( Esm) Proposed In The Technical And Energy Survey And Provision Of An Accessible Environment In The Building For People With Reduced Mobility In Accordance With The Requirements Of Ordinance No. Of The Accessible Environment In The Urbanized Territory And Of The Buildings And Facilities Of The Multi-Family Residential Building Located At The Address: Town Of Svishtov, Street Kiril D. Avramov #10. Exercise Of Author Supervision During The Execution Of Construction And Assembly Works In Accordance With The Requirements Of Art. 162, Para. 2 And Para. 3 Of The Territorial Planning Act. Performance Of The Construction And Installation Works Of The Multi-Family Residential Building In The Town Of Svishtov According To The Work Investment Project Prepared By The Contractor, Agreed And Approved In The Relevant Order. The Implementation Of The Following Main Construction And Installation Works Is Planned: Energy Saving Measure B1: Thermal Insulation Of Walls - Delivery And Installation Of A Thermal Insulation System With Eps With A Thickness Of 12 Cm, Delivery And Installation Of A Thermal Insulation System Type Xps 20 Mm, Laying Of Colored Silicate Exterior Plaster (According To Color Project) – 1970.00 M2; Energy Saving Measure B3: Thermal Insulation Of The Roof - Delivery And Installation Of Thermal Insulation Stone Wool With A Thickness Of 12 Cm - 294.80 M2, Delivery And Installation Of Waterproofing - One Layer Without Sprinkles App 4.0 Kg/M2 Per Roof Slab - 294.80 M2 , Delivery And Laying Of Waterproofing - One Layer With App Sprinkler 4.5 Kg/M2 Per Roof Slab - 294.80 M2; Energy Saving Measure B4: Thermal Insulation Of The Floor - Delivery And Installation Of Pvc Windows With Five Chambers And Double Glazing With A Low-Emission Heat Transfer Coefficient Of The Assembled Sample Uw < 1.40 W/M2k – 9.90 M2, Delivery And Installation Of A Thermal Insulation System With Xps 10 Cm, Delivery And Laying Of Mosaic Plaster On The Plinth - 95.40 M2, Thermal Insulation System Type Xps 20 Mm, Delivery And Laying Of Mosaic Plaster On The Sides Of Openings - 55.80 M2, Delivery And Installation Of Thermal Insulation System Eps With A Thickness Of 12 Cm, Delivery And Laying Of Colored Silicate Exterior Plaster For The Bay Window – 29.40 M2; Energy Saving Measure B5: Replacement Of Windows - Dismantling Of Existing Windows And Supply And Installation Of Pvc Windows With Five Chambers And Triple Glazing - All-Season / White / Low-Emission Heat Transfer Coefficient Of The Assembled Sample Uw < 1.10 W/M2k – 208.70 M2 ; Energy Saving Measure C12: Lighting Installation - Delivery And Installation Of Led Lighting Fixtures With A Built-In Motion Sensor With A Power Of 6 W - 8 Pcs. Measures To Improve Access For People With Reduced Mobility - Implementation Of Cmp To Improve Access For People With Reduced Mobility To The Entrance Doors Of 1 B
Key Value
Tender Value
337,647 - BGN
Tender Documents
Global Tender Document
d54ec831-233e-4d94-8023-bd8dda599c3e.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders