GTR 88526207
Tenders Are Invited For Installation Work Of Illumination And Signaling Systems - Construction And Installation Work Directly Related To The Introduction Of Energy-Efficient Measures Through Reconstruction, Modernization And Intelligent Management Of Street Lighting On The Territory Of The Municipality Of Stamboliyski - Joakim Gruevo Village, Kurtovo Konare Village, Novo Selo Village And With Trivodics
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
88526207
Tendering Authority
Subscribe to view
Tender No
693780-2024
Financer Name
European Union (EU)
Work Title
Tenders Are Invited For Installation Work Of Illumination And Signaling Systems - Construction And Installation Work Directly Related To The Introduction Of Energy-Efficient Measures Through Reconstruction, Modernization And Intelligent Management Of Street Lighting On The Territory Of The Municipality Of Stamboliyski - Joakim Gruevo Village, Kurtovo Konare Village, Novo Selo Village And With Trivodics
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
13-12-2024
Closed
Work Detail
Installation Work Of Illumination And Signaling Systems - Construction And Installation Work Directly Related To The Introduction Of Energy-Efficient Measures Through Reconstruction, Modernization And Intelligent Management Of Street Lighting On The Territory Of The Municipality Of Stamboliyski - Joakim Gruevo Village, Kurtovo Konare Village, Novo Selo Village And With Trivodics. The Current Public Procurement Provides For The Technical Renewal Of The Street Lighting In The Territory Of The Village Of Joakim Gruevo, The Village Of Kurtovo Konare, The Village Of Novo Selo, The Village Of Trivodici To Improve The Living Conditions Of The Local Population And Increase Energy Efficiency. As Part Of The Investment, Led Street Lights Will Be Delivered And Installed, Including Those Complete With A Photovoltaic Panel And Battery Unit, And A Digital Control And Monitoring System Will Be Built On The Territory Of The 4 Villages. The Main Objectives Of The Implementation Are The Realization Of Energy Savings In The External Artificial Lighting Systems On The Territory Of The Four Settlements In The Municipality Of Stamboliyski By About 80%, The Reduction Of Costs For Electricity And The Operation Of Vio And Digitalization Through The Implementation Of An Intelligent System For Automation And Control And Consumption Monitoring. Led Street Lights Provide 1.5 To 3 Times Greater Energy Efficiency Than Sodium And Mercury Lamps With Similar Luminous Flux, While Simultaneously Providing Visual Comfort And Evenness And Sufficiency Of Illumination. As A Result Of The Implementation Of The Project, We Will Achieve Better Living Conditions On The Territory Of The Municipality And Construction Of Street Lighting In Accordance With Modern European Requirements And The New Achievements Of Lighting Technology, Including Intelligent Measurement And Management Of Consumption; Delivered And Installed New Consoles And New Street Lighting Fixtures, 20 Of Which Complete With Photovoltaic Panel And Battery Unit. The Project For The Introduction Of Energy-Efficient Measures Through Reconstruction, Modernization And Intelligent Management Of Street Lighting On The Territory Of The Municipality Of Stamboliyski - The Villages Of Joakim Gruevo, Kurtovo Konare, Novo Selo And Trivodici Provides That At The Time Of Design There Are 1258 Existing Lighting Fixtures That Should Be Replaced, A System For Central Control And Monitoring Of The Newly Designed Street Lighting Is Foreseen. The Described Smrs Are Carried Out By The Contractor Selected In Accordance With The Ppa Order According To The Approved Project, Complying With The Technical Specifications, The Requirements Of The Contract And The Legal Provisions. During Construction, The Contractor Will: Assume Full Responsibility For The Quality And Timely Performance Of The Activities Under The Contract; Complete And Correctly Draw Up All Acts And Protocols During Construction; Carries Out Laboratory Control With An Accredited Construction Laboratory In Compliance With The Current Regulatory Documents; Monitors The Provision Of Temporary Organization During Construction; Complies With The Requirements For Health And Safety Working Conditions; Does Not Allow Damage To Third Parties And Property; Monitors The Suitability Of The Construction For Commissioning. The Contractor Keeps An Order Book At The Construction Site, In Which All Prescriptions And Orders Related To The Implementation Of Smr, Issued By Authorized
Key Value
Tender Value
798,915 - BGN
Tender Documents
Global Tender Document
19166022-229e-4b0a-9089-ec59ca878dba.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.